- 10
- 0
- 约2.14万字
- 约 18页
- 2017-06-11 发布于河南
- 举报
带电作业一些常见问题供参考(国外英语资料)
带电作业一些常见问题供参考(国外英语资料)
Four. Questions and answers:
1. how many regular tests are there for live working tools? How long is the test cycle?
Answer: Live tools should be periodically tested electrical and mechanical tests, the test cycle is:
Electrical test: preventive test once a year, inspection test once a year, two test intervals of six months; mechanical test: insulation tools once a year, metal tools once every two years.
2., why is the insulator degradation rate near the conductor high?
Answer: according to the voltage distribution law of the insulator string (U curve), it is known that t
您可能关注的文档
最近下载
- 泌尿外科尿液培养PDCA优化.pptx
- 《电力建设工程概算定额章节说明》(2018年版) 第一册 建筑工程.pdf VIP
- 巨人通力GPS53K(SIEI)-YH_电气原理图纸G3001007(B)N-2020-12.pdf
- 2025年春新苏科版物理八年级下册全册教学课件.ppt
- 小区物业服务方案〖完整版〗.doc VIP
- 中国肺血栓栓塞症诊治、预防和管理指南(2025版)学习与解读ppt课件.pptx VIP
- 物业服务方案完整版.docx VIP
- 提高住院患者大小便标本送检率PDCA.pptx
- 中国文化概况AGlimpse of Chinese Culture-Chapter 3课件.pptx VIP
- 关于志书资料的搜集.ppt VIP
原创力文档

文档评论(0)