粉喷桩(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
粉喷桩(国外英语资料)

粉喷桩(国外英语资料) Design method and construction quality management of soft foundation treated with powder jet pile Abstract: This article in view of the current engineering practice of expressway construction in our province a lot by spray powder pile in soft soil foundation, from the two aspects of design method and construction quality management describes the effective measures to guarantee the DJM pile, in order to improve the level of the design and construction of our province soft soil foundation treated with cement injection pile. Key words: expressway; soft foundation treatment; powder injection pile; design and construction Since I am located in the water network area between the coast, along the Yangtze River and the Huaihe River, from the more than 1000 km expressway built and under construction, the subgrade of 70% to 80% above all passes through the soft soil area. The soft foundation treatment is good or bad, directly affects the stability of the subgrade, the overall engineering operation quality and the economy of the project. At present, the main treatment methods of soft foundation are as follows: plastic drainage plate; mixing pile (powder spraying pile and deep mixing pile); geosynthetics reinforced; and (ultra) preload. In contrast, the powder spray pile has short period, the settlement characteristics of small construction period and preloading, is widely used in soft foundation treatment of Expressway in our province, for example, was built in the Jiangsu section of Shanghai Nanjing Expressway, powder spraying pile in soft foundation treatment project amounted to millions of meters, is the construction of the Jiangsu 95 the highway also uses DJM about ten million linear meters, and most of them have been completed. Design method and points for attention of 1 powder jet pile 1.1 design standards 1.1.1 reference period and allowable post construction settlement The flexible pavement design life for 15 years, according to the usual practice of the re

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档