- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中导洞开挖施工组织设计(国外英文资料)
中导洞开挖施工组织设计(国外英文资料)
The design of the excavation construction of the middle guide hole
One, engineering situation:
The tunnel is designed as a double arch tunnel, with an import mileage of K73 + 157, and the export range is K73 + 620, the tunnel is 463m, and the line is 2.5%.
The rock of the tunnel excavation area is of a thousand laminar rock, the soft rock of the silvery sand, the structure of the rock is loose and weather-full weathering. In the excavation area, the development of tectonic development, the visual fracture zone is more than 6.
The tunnel seepage water is the fourth system of pore water, the tectonic belt fissures water is the main, encounter the rain weather, the tunnel surge of water has multiplied the growth.
The main project of the excavation: 12000m3 of the excavator, the C25 concrete 810 m3, the steel arch support 246T.
Second, mechanical equipment and personnel arrangement
The machinery and equipment required for the excavation of the central cave shall be submitted for inspection.
staffing
Personnel category
Number of people
Tunnel team
Management personnel
6
Technical personnel
8
Construction personnel
88
Tunnel three
Management personnel
5
Technical personnel
6
Construction personnel
78
3, construction plan arrangement
In order to speed up the tunnel construction progress, arrangement of tunnel, tunnel three teams respectively from the import, export and excavation steps, the specific schedule as follows:
arrange
Fourth, main construction method
In advancing drift is must process of multi-arch tunnel, through the pilot tunnel construction, and further proved the geological and hydrological conditions of tunnel excavation area, for the tunnel is a reliable basis for the determination of construction scheme of the cave.
According to the development and structure of surrounding rock, the excavation of the tunnel construction to take two steps, tunneling construction take short footage, weak blasting, backhoe excavator ballast raking, loader
您可能关注的文档
- 【第二次修订完全版】人体系统解剖学(国外英文资料).doc
- 【转】扑克牌英文大全 - 日志 - 青岛新航道 - 新航道英语知识社区(国外英文资料).doc
- 【转帖】高清播放 KMP分离器应用超详尽法则(国外英文资料).doc
- 【郑州】《商业地产全流程策划定位、招商运营实操心法与实体O2O电商经验借鉴》(3月28-29日)(国外英文资料).doc
- 【青葱】兔子幻想(国外英文资料).doc
- 【重要】办公场所及家庭火场常识(国外英文资料).doc
- 一、产品说明书的概念(国外英文资料).doc
- 《砌体工程施工质量验收规范》 简介(国外英文资料).doc
- 一、皮带输送机(国外英文资料).doc
- 一个合格SEO团队分工配置情况(国外英文资料).doc
文档评论(0)