自动化工程导论报告.docx

自动化工程导论报告

工程导论供电系统设计核心理论When an application command SSB POS=POST1/SB is supplied from a master power supply, a control circuit 11 sends a command SSB POS=POST2/SB for application of power supply to a CPU, for example, corresponding to a power supply control unit 1. If the CPU which received the command SSB POS=POST2/SB has no power supply fault, an answer signal SSB POS=POST3/SB is supplied to an AND gate 14. While the signal SSB POS=POST3/SB is not supplied to a time monitor circuit 12 if the corresponding device has a power supply fault, and therefore a command is sent forcibly to a power supply contr

文档评论(0)

1亿VIP精品文档

相关文档