- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
安装工程预结算几个容易遗漏的问题(外国英文资料)
安装工程预结算几个容易遗漏的问题(国外英文资料)
Installation projects presettle several issues that are easily omitted --
The production and construction of the renovation project shall be increased by 10%
The cost of scaffolding and the increase of high-rise buildings
The system commissioning fee
The first volume of chapter 14 shows seven
The cost of labor is adjusted
The adjustment factor of the visa fee
The labor cost of a mechanical desk
In particular, it is important to check that the total cost of uninvoiced materials for the meter and the fee is consistent.
The cost of the charge of the pipe is different.
The charge of the materials for the use of the material
Construction is up 20% from the 25km temporary facility
This is not pre-settlement knowledge and level, its just easy to forget. This year, a number of omissions have been missed in several pre-settlement accounts. Especially in a hurry to catch a project.
Last year, one of my project after repeated adjustment costs table not denominated in cost of raw materials more than in the table are denominated in the hundreds of thousands of (in fact, this problem should not appear), white make auditors picked out. Thankfully, if its the other way around -- its less, its passive, and Im miserable.
Being fostered fostered fostered
I always have a wish: the budget software, the existing project information belong to manual that part of the move out as a separate label. Put the engineering information into a veritable engineering information, put all of the above information, and then confirm everything is OK. BR
The cover
Whether the cover format is consistent with the format of the request for the tender documents, and whether there is a typo in the text.
The length of the cover and the length of the cover shall be the same as the length of the bid.
3, whether the enterprise as a legal person or the entrusted agent signature or stamp in accordance with the relevant provisions, whether or not the bidding in accordance with the provis
文档评论(0)