2012市冲刺题第二套(国外英文资料).doc

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2012市冲刺题第二套(国外英文资料)

2012市冲刺题第二套(国外英文资料) In 2012, a construction division of municipal engineering sprint test second sets A single choice (a total of 20 questions, 1 points for each question. Each item options, only 1 of the most to do) The surface layer 1. is applied to the road pavement, the branch and the following branches, as well as all levels of asphalt pavement base, the connecting layer or leveling layer of asphalt pavement surface type (is). A. asphalt penetration layer B. warm mix asphalt mixture layer C. hot mix asphalt mixture layer D. cold mix asphalt mixture layer 2. at home and abroad to use more of a strong resistance to deformation, better durability of asphalt pavement mixture (is). A. modified asphalt mixture B. asphalt mastic macadam mixture C. modified (SMA Li Qing) D. common asphalt mixture The 3. uses a lot of current structure more compact, low porosity and permeability is smaller, better water stability, suitable for mechanized construction technology, economic reasonable cement and lime stabilized materials and industrial waste as road base, usually referred to as (). Stabilized with A. inorganic material B. special base C. organic binder stabilized base D. base The provisions of the 4. urban road construction pre acceptance norms, hot mix asphalt pavement paving layer should be natural cooling to the surface temperature below) (DEG C, be open to traffic. A.5 B.25 C.50 D.70 The 5. is characterized by simple form, local materials, convenient construction of retaining wall is (). A. gravity retaining wall B. balance weight retaining wall C. self retaining wall D. anchor earth retaining wall 6. tendons (not included). A. wire B. hot rolled ribbed bar C. steel strand D. finishing rolling rebar 7. impact drill bore drilling hole (m) of each was 1 times, in front of replacing the drill bit or easy shrinkage, are fulfilled hole and shall be recorded. A.1 ~ 2 B.2 ~ 3 C.3 ~ 4 D.4 ~ 5 8. according to the operation of nature, can be connected, send two line train statio

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档