2012市冲刺题第二套(国外英文资料)
2012市冲刺题第二套(国外英文资料)
In 2012, a construction division of municipal engineering sprint test second sets
A single choice (a total of 20 questions, 1 points for each question. Each item options, only 1 of the most to do)
The surface layer 1. is applied to the road pavement, the branch and the following branches, as well as all levels of asphalt pavement base, the connecting layer or leveling layer of asphalt pavement surface type (is).
A. asphalt penetration layer
B. warm mix asphalt mixture layer
C. hot mix asphalt mixture layer
D. cold mix asphalt mixture layer
2. at home and abroad to use more of a strong resistance to deformation, better durability of asphalt pavement mixture (is).
A. modified asphalt mixture
B. asphalt mastic macadam mixture
C. modified (SMA Li Qing)
D. common asphalt mixture
The 3. uses a lot of current structure more compact, low porosity and permeability is smaller, better water stability, suitable for mechanized construction technology, economic reasonable cement and lime stabilized materials and industrial waste as road base, usually referred to as ().
Stabilized with A. inorganic material
B. special base
C. organic binder stabilized base
D. base
The provisions of the 4. urban road construction pre acceptance norms, hot mix asphalt pavement paving layer should be natural cooling to the surface temperature below) (DEG C, be open to traffic.
A.5
B.25
C.50
D.70
The 5. is characterized by simple form, local materials, convenient construction of retaining wall is ().
A. gravity retaining wall
B. balance weight retaining wall
C. self retaining wall
D. anchor earth retaining wall
6. tendons (not included).
A. wire
B. hot rolled ribbed bar
C. steel strand
D. finishing rolling rebar
7. impact drill bore drilling hole (m) of each was 1 times, in front of replacing the drill bit or easy shrinkage, are fulfilled hole and shall be recorded.
A.1 ~ 2
B.2 ~ 3
C.3 ~ 4
D.4 ~ 5
8. according to the operation of nature, can be connected, send two line train statio
您可能关注的文档
- 05-06年高三语文第六册期中测试1(国外英文资料).doc
- 05-06年高三语文第六册期中测试764(国外英文资料).doc
- 06年《环境与资源保护法》听课笔记(五)(国外英文资料).doc
- 06——07药用植物学(国外英文资料).doc
- 06年《环境与资源保护法》听课笔记(六)(国外英文资料).doc
- 06年《环境与资源保护法》听课笔记(七)(国外英文资料).doc
- 07.3.功和能(国外英文资料).doc
- 07.应急处理07-04-01(国外英文资料).doc
- 07公考申论热点问题标本模式:户籍制度改革(国外英文资料).doc
- 07届毕业生对母校建议(国外英文资料).doc
- 2024年中国无糖型魔芋黑米粉市场调查研究报告.docx
- 2024年麻辣火锅风味项目可行性研究报告.docx
- 2024至2030年薄涂型地坪漆项目投资价值分析报告.docx
- 2024至2030年中国电源供应器线扣数据监测研究报告.docx
- 2024至2030年中国铅酸蓄电池再生器行业投资前景及策略咨询研究报告.docx
- 2024年薄顶封口铝管项目可行性研究报告.docx
- 2024年中国小巧型压力变送器全套散件市场调查研究报告.docx
- 2024至2030年熊标本项目投资价值分析报告.docx
- 2024年中国蛀虫布市场调查研究报告.docx
- 2024至2030年高压电击电源项目投资价值分析报告.docx
文档评论(0)