家庭装修水电布置规范贴(国外英文资料).doc

家庭装修水电布置规范贴(国外英文资料).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
家庭装修水电布置规范贴(国外英文资料)

家庭装修水电布置规范贴(国外英文资料) I. drainage works Water supply and drainage works include pipe fittings and all kinds of faucets, angle valves, fittings for water supply, indoor drainage works, etc.. Basic requirement: 1, approach must first test the horizontal line, check whether the original water pipe is unblocked; 2, the original lead-in power (meter capacity, in line with the size), telephone line, broadband information network can adjust; 3, on-site check home appliances, lamps, switches and sanitary ware location and drawings are consistent or missing, if inconsistent with the actual situation should be adjusted; 4, in addition to the design specified, hot and cold water pipes are used steel tubes, unified with 20mm supervisor, in charge with 16mm; before installation should check whether pipeline unimpeded; 5, shall not arbitrarily change the drainage pipe, floor drain and toilet and other waste, sewage drainage nature and location. Except for special conditions, the drain pipe must have a little water storage to prevent odor from being placed on the line; 6, all steel pipes connected by screws, and flax, thick paint or raw materials with lining, piping acceptance shall comply with the =0.6Mpa pressure regulator; 20 minute tube pressure decreased as the standard of =0.5Mpa; sewer pipe after completion of all temporary sealing, to prevent blocking chores; 7, the installation of the pipeline should be horizontal, vertical, laying solid, PVC down the water pipe must be glued tight, slope meets the requirements of 35/1000; 8, pipe installation shall not be close to the power supply, and in the wire pipe below, cross need to bridge over bend, water pipe and gas pipe spacing should be not less than 50mm; 9, leading to the balcony of the water pipes must be fitted with valves, as far as possible to avoid joint; 10. The distance between hot and cold pipes shall be determined according to the actual size of the taps. The two leaders (with the head of the heart must galvanized pi

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档