- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电安装工程监理实施细则(国外英文资料)
水电安装工程监理实施细则(国外英文资料)
Electrical engineering
I. strictly control raw material quality
1. the type, specifications and strength of the material shall comply with the design requirements.
2. when the material enters the factory, the factory must have the certificate of qualification, and the supervisor shall take samples and check the samples.
3. iron pipe approach, you must rust, brush anti rust paint after use.
Two. Construction quality control point
1. piping should be layered and segmented, a check, the location, size, height, camber, joint, Guan He, fixed orifice treatment compliance.
Two
Earthing pole laying, lightning protection lead line and lightning protection belt shall check whether the welding, corrosion prevention and laying are in accordance with the standards and keep a record. The use of structural reinforcement made of lightning lead wire, the structure of steel continuous compliance with specifications and requirements, specifications section is correct.
3. the color, insulation and installation of the wires meet the requirements.
4. the installation of electrical equipment should pay attention to the model, elevation and location, whether it meets the requirements of the drawings, wiring methods are in line with specifications.
Three. Construction quality requirements
1. installation quality control of distribution box
According to the code for construction and acceptance of electrical lighting installations for electrical installations, GB50259 - 96
(1)
The inlet pipe hole of the distribution box shall be a pressing hole, and the inlet pipe shall be introduced from the hole with proper specifications and arranged in a straight line. The length of the inlet and the trunk shall be provided with the locking nut, and the remaining 2-4 buckles shall be provided with a retaining cap. Prohibit the use of welding and welding cutting holes, the box deformation caused by heat.
(2) the wires in the distribution box must be firmly connected and bundled into bu
您可能关注的文档
- 最常用的EDA软件(国外英文资料).doc
- 最后100天语文成绩如何快速提升(国外英文资料).doc
- 最新MC人物大全.(国外英文资料).doc
- 最新垫片选用(国外英文资料).doc
- 最新大学英语六级词汇表2(国外英文资料).doc
- 最新整理的一般公文的字体、字号设置标准(国外英文资料).doc
- 最新最便宜老人葵价格,中东海枣价格,银海枣,加拿利海枣价格,苏铁价格,美人树价格,火焰木价格(国外英文资料).doc
- 最新最便宜加拿利海枣价格,中东海枣价格,老人葵价格,小叶榕价格,苏铁价格,美人树价格,火焰木价格(国外英文资料).doc
- 最新的新闻评论422(国外英文资料).doc
- 最新福州旅游攻略(国外英文资料).doc
文档评论(0)