- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
网络布线施工(国外英文资料)
网络布线施工(国外英文资料)
On a large scale building or communication network system wiring, rely on network technology personnels strength is not enough, also need the construction personnel in the wiring system engineering, and the construction personnel on most of the network or computer knowledge nothing, they will often take a telephone line, network cabling and confused the line and other lines, so these workers in the specific wiring, will not consider all the details of the network layout, for example between the cable and the interface module connected between the cable and the cable connected with the first crystal and the network connection and other details, if these construction workers do not strictly ensure the quality of construction, do not pay attention to these the details of the treatment, a great impact on the network transmission performance will.
For users, the only means of detecting cable layout quality, is in the routing completion, simply use the network to detect the command Ping - under the network connecting situation, as long as the Ping network if you think the wiring work would be qualified.
In fact, network cabling, and not simply check whether the network connectivity is so simple, but also need to look at the network transmission speed is reached the nominal value of network products, will be a wiring construction quality is not good in the transmission speed greatly reduced.
In addition, we must pay attention to comprehensive examination of the cable system layout, such as the first through the network cable tester see 8 cable cable connection sequence and test whether is this test for ordinary users can also be very convenient, as long as the purchase of a detector can be.
Test system for large scale network, higher requirements for the transmission of the signal, the overall losses must also be connected to the special testing instrument meter check points, if the loss in signal, so the construction quality must not pass, in addition to th
您可能关注的文档
最近下载
- 变电设备检修工职业认证隔离开关主刀闸工作原理GW23B-126型隔离开关说明书.pdf VIP
- QB1696-1993啤酒麦芽附录A比重与浸出物含量对照表.pdf VIP
- 《先兆流产》课件.ppt VIP
- (2025秋新版)部编版二年级语文上册全册PPT课件.pptx
- 清洁设备操作及日常保养标准作业规程.doc VIP
- 2025年高中政治必修同步课时练 必修一 第一课 周练过关(一).pdf VIP
- 2025年中考备考:人教版九年级物理上册全书课后练习答案.docx VIP
- 班级卫生值日表模板.xlsx VIP
- 深基坑开挖及支护施工专项方案.doc VIP
- 学习2025《初中生自我介绍》专题课件ppt.pptx VIP
文档评论(0)