- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
31000轮机大纲
CONTENT
PART I MOORING TEST 3
1. General 3
2. Main propulsion system 4
3. Main diesel generator set 5
4. Emergency diesel generator set 7
5. Oil fired boiler, exhaust gas boiler and steam system 9
6. Air compressor, air receiver and compressed air system 11
7. F.O. L.O. valve quick close system 13
8. FO LO purifiers 14
9. FO system 15
10. LO system 16
11. Cooling water system 17
12. Oily-water separator bilge system 18
13. Ballast pump ballast system 19
14. Fire pumps fire extinguish system 20
15. Sewage treatment plant system 21
16. Incinerator system 22
17. Domestic water drainage system 22
18. Air. Sounding filling pipes 23
19. Valve remote control system 24
20. Level remote gauging system 24
21. Workshop equipment 24
22. ER lifting installation 25
23. ER ventilation 26
24. Air conditioning system 26
25. Mechanical ventilation 27
26. Provision system 28
27. Cargo hold water sprinkling system 29
28. Dead ship recovery test 29
PART II SEA TRIAL 30
1. Main propulsion system 30
2. Exhaust gas boiler 31
3. FW generator 32
4. Shaft vibration and shaft power measurement (only for first vessel) 32
5. Running test for main diesel generator set 32
6. Vibration and noise measurement 32
7. Dead ship recovery test 32
8. Main engine Starting test (according to Part I, 2.2.2) 33
PART I MOORING TEST
General
Purpose
The purpose of the onboard test is to be confirmed that all machineries in the engine room are installed properly and can be operated satisfactorily in their system.
Safety device and alarms to be tested according to “SCHEDULE OF MOORING TEST SEA TRIAL FOR E/R AUTOMATION SYSTEM ”(-946-04).
Test method
Pressure switch
Testing device is to be fixed to the three way joint which is arranged temporarily or permanently on pipe line for pressure switchThe alarm setting pressure and concerned alarm circuit to be checked with the standard pressure gauge by slowly releasing pass through Y cock. The alarm setting pressure can also be checked by means of ch
您可能关注的文档
最近下载
- T_CCUA 048-2025 政务信息系统运行维护费用定额测算方法.pdf VIP
- 大金控制手册.pdf VIP
- (1)--第2章-材料的结构材料化学.ppt VIP
- YY 0793.2-2023 血液透析和相关治疗用液体的制备和质量管理 第2部分:血液透析和相关治疗用水.pdf
- 【语文单元主题教学】六年级上册第三单元《单元整体教学以及教材解读》课件部编版创新.pptx VIP
- 一班第二组象物字课程.ppt VIP
- 企业安全生产应急预案(汇编5).pdf VIP
- 课题申报参考:“银发经济”发展的国际经验借鉴研究.docx VIP
- 校园网基础设施投资与运维服务规划与执行方案.docx VIP
- 2025呼和浩特粮油收储有限公司招聘18名工作人员笔试备考试题及答案解析.docx VIP
文档评论(0)