- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
专业石油(国外英文资料)
专业石油(国外英文资料)
1 Carry out drilling operation in accordance with the drilling program.
Prepare bell for the bell.
3 Make up 2 joints of drill pipe.
A. Break out this connection.
5 Run hole opener to sea bed
Mix gel fluid for drilling conductor hole.
7 Make up a bottomhole assembly
8 Check and reset crown - saver on every tour.
Number stands on trip out and trip in.
10 Pick up BHA and run to seafloor.
Pick up the post
Dont drill faster than 15 minutes for a stand
13 Drop TOTCO
14 Fish TOTCO with overshot
Resume drilling to T.D. continues to get in the way
15 minutes. 15 minutes
A. Run in a hole
18 Put out of the hole
Make an inventory of all ring gaskets
Use a pneumatic wrench
The air winch operates the air winch
22 Lay down 57 joints of drill pipe
23 Pick up the drill stem test tool
24. Circulate mud for 2 hours
25 Move string during circulation
The circulation hole clean
The circulation has been recirculated for several weeks
Fill up every 5 stands
Check mud weight every 15 minutes
30 Reverse out excess cement
The old mud was replaced by new mud
Stop drilling
The drill is in the air
A: Pull out of hole bit
Change bit
A. Run the wear bushing
The bit thread type is regular pin
Whats the make up torque? What is the upper buckle torque?
A. Run in 9 collars
The cathead cant give enough torque
Connect crossover sub
The tong Angle is too small
43. Stop circulating. Stop circulating mud
A. Break out the stand
A: Set the single into the mousehole
Can we break out the pipe with rotary table? Can you use a turntable shackle?
47. No! Break it out with tong. To use the tongs shackle
A: Spin it out with the air spanner
Put the pipe wiper on the string
Dont set the drill pipe on the pipe
A: Make up the lift sub
Secure the safety
53. The bit is nearing The shoe. Bit close to The casing shoe
Slow down the running speed
This is the undergauged interval
This is the drilling program
How much weight on bit is required? How much weight?
Keep the rotary speed at 120-140 RPM. Keep the rota
您可能关注的文档
- PVC现有书籍类目资料整理(国外英文资料).doc
- QJ23A型直流电阻电桥(国外英文资料).doc
- QQ飞车老玩家的几点忠告(最简单漂移。抽奖,永久ABC)(国外英文资料).doc
- rcc电源详细(国外英文资料).doc
- QQ飞车教程(国外英文资料).doc
- RomaxDesigner--十个实例分析中文翻译(国外英文资料).doc
- RX93 ν高达 高达世界机体简介s(国外英文资料).doc
- proteus元件对照表(王征2014-10-3)(国外英文资料).doc
- QMC系统操作手册(国外英文资料).doc
- San Ace替代Axial(国外英文资料).doc
- 2024高考物理一轮复习规范演练7共点力的平衡含解析新人教版.doc
- 高中语文第5课苏轼词两首学案3新人教版必修4.doc
- 2024_2025学年高中英语课时分层作业9Unit3LifeinthefutureSectionⅢⅣ含解析新人教版必修5.doc
- 2024_2025学年新教材高中英语模块素养检测含解析译林版必修第一册.doc
- 2024_2025学年新教材高中英语单元综合检测5含解析外研版选择性必修第一册.doc
- 2024高考政治一轮复习第1单元生活与消费第三课多彩的消费练习含解析新人教版必修1.doc
- 2024_2025学年新教材高中英语WELCOMEUNITSectionⅡReadingandThi.doc
- 2024_2025学年高中历史专题九当今世界政治格局的多极化趋势测评含解析人民版必修1.docx
- 2024高考生物一轮复习第9单元生物与环境第29讲生态系统的结构和功能教案.docx
- 2024_2025学年新教材高中英语UNIT5LANGUAGESAROUNDTHEWORLDSect.doc
文档评论(0)