室内消火栓安装(国外英文资料).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内消火栓安装(国外英文资料)

室内消火栓安装(国外英文资料) Plan for the installation of the internal fire hydrant system 1 scope This process is suitable for the installation of the indoor hydrant pipe system in civil and general industrial buildings. 2 construction preparation 2.1 main ingredients: 2.1.1 fire hydrant system pipe should be selected according to the design requirements, generally USES the carbon steel pipe or seamless steel tube, tubing shall not be bent, rust, double skin and concave and convex inequality. The type of type 2.1.2 hydrant box shall conform to the design requirement, the cabinet surface is flat and clean. The metal case is not corroded, cut, the door is open and flexible. The box is square and all parts are well. The valve exterior rules, no crack, open and close, close tightly, the sealing packing is in good condition, and the products are well certified. 2.2 main machine tools: a silk machine, grinding wheel saw, bench drill, electric hammer, hand grinding wheel, hand electric drill, electric welding machine, electric test pump and so on. Silk board, tube pliers, vice, pressure pliers, chain tongs, handhammer, hacksaw, wrench, nail gun, reverse chain, electric welding and other tools. 2.3 working conditions: Construction drawings and relevant technical documents shall be complete, and the on-site water, electricity and gas shall meet the continuous construction requirements, and the system equipment materials will guarantee the normal construction. The baseline required for piping and box installation shall be determined and marked. The reservation and burial have been completed with the construction. 3 operation process 3.1 process flow: Installation preparation, dry-pipe installation, box and branch installation, box parts installation, water debugging 3.2 installation preparation: 3.2.1 seriously familiar with drawings, combined the situation whether review coordinates and elevation of the pipe position properly, if there are any problems, promptly with the designer on th

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档