- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
莱斯顿 豆浆机的任务道理介绍(国外英文资料)
莱斯顿 豆浆机的工作原理介绍(国外英文资料)
Circuit characteristics
General soybean milk machine preheating, beating, boiled pulp, such as full automatic process, is controlled by MCU on foot, corresponding triode drive, then group composed of multiple relay relay circuit conversion to complete. As long as you master this basic rule, you can check the soybean milk machine of all the machines and eliminate all kinds of failures. However, some models of circuit board production is a little problem, it is to press the number of components in the components, therefore can only see on the circuit board components, and cant see the element number, so for circuit testing is extremely convenient.
The working process
Adding suitable amount of water, warm water or cold water can be, after electrify start pulp function, start heating, electric heating tube set water temperature reached stable after 25 minutes, beating function, when the water temperature reaches set temperature, the motor start work, for the first time beating, and then continue to beating temperature after heating touch and spill-proof motor, beating/heating, kept beating and heating in this phase, the beans completely shattered, preliminary boiling soya-bean milk, boiled, soya-bean milk boil, into the boiling stage, the clearance between the heat pipe and heat, make the soya-bean milk fully cooked, emulsified completely.
Component testing
Power transformer, resistance, capacitance and diode, triode, the basic detection: this several element detection mostly in measuring way, desirable down to a separate test when necessary, the method is very simple.
A, by observing the appearance of transformer to check whether there is obvious anomaly: such as whether the coil wire fracture, desoldering, insulation sear, core fastening screw loosening, silicon steel sheet of rustily, winding coil to see if there is leakage, etc. B, insulation test: use a multimeter R x 10 k block measuring core and primary, respectively, and the secondary, pr
您可能关注的文档
最近下载
- 租山地合同范本.docx VIP
- 内燃机 气门弹簧 产品质量分等分级规范.pdf VIP
- 继承和弘扬伟大抗战精神今年是中国人民抗日战争暨世界反法西斯战争胜利80周年.pptx VIP
- 新2025年推普周班会.ppt
- 2025山东枣庄市口腔医院合同制专业技术人员招聘23人笔试备考试题及答案解析.docx VIP
- 2025山东枣庄市口腔医院合同制专业技术人员招聘23人笔试参考题库附答案解析.docx VIP
- 福建省福州华伦中学2023-2024学年九年级上学期月考数学试题.pdf VIP
- 精通版5年级上册英语全册教学课件(2021年秋修订).pptx
- DCS在电厂热工控制系统中的应用与管理维护.docx VIP
- 设计符号学提喻.ppt VIP
文档评论(0)