沥青混合料拌和设备论文翻译
Chapter 10 Asphalt Plants
10. 1 Introduction
Asphalt mixture is widely used in the road making. It is a high grade material of road surface. At present producing of asphalt mixture mechanized. Its productive equipment is called asphalt mixture plant.
Asphalt mixing plant can be classified as follows:
a) By the period of operation and the area serviced, asphalt mixing plants can be subdivided into stationary, semi-stationary and mobile.
b) By their productive process: conventional (or batch) and continuous (or drum). Mobile asphalt plant is usually applied on small scale site and temporary occasion, stationary asphalt mixing plant is reverse of the mobile.
10. 2 Batch Mobile Asphalt Plants
1. Basic mobile batch mix layout (Fig. 10-1)
From the sand hopper by belt feeder and from the stone hoppers by either electric vibrating feeders or belt feeders, material is fed onto a continuous belt conveyor and delivered to the dust plant/dryer via an inclined belt conveyor. The belt conveyor delivers material to the Dryer feed ring, which moves the material onto a series of lifters. As the Dryer cylinder rotates, the material is cascaded through hot gases produced by the oil burner and travels a-long the length of the cylinderto the discharge end[l]. Pusher plates allow side discharge of material into a discharg-= chute, which feeds into the boot of the hot stone elevator. The multi-cyclone, single stage dust collecting plant mounted on the rear of the chassis collects the dust and is delivered to the Dryer discharge chute by means of two screw conveyors. The hot stone elevator takes the material from the Dust plant/Dryer unit onto the vibrating screen where the material is graded and delivered into the individual compartments of the hot stone storage bins. Oversize material rejected by the top deck of the screen is passed to a reject chute at the end of the mixing and screening section. The filler is loaded into the silo and with the binder supply in c
您可能关注的文档
- 江苏省四星级高中2015-2016学年高二上学期联考试题 英语.doc
- 江苏省四校2017届高三12月联考英语单选解析版.doc
- 江苏省四星级高中2015-2016学年高二上学期12月月考英语试题.doc
- 江苏省大丰市新丰中学2015-2016学年高二上学期12月月考英语试题.doc
- 江苏省句容市2016届中考英语网上阅卷第一次适应性检测试题.doc
- 江苏省大港中学第一学期高三英语第八周作业.doc
- 江苏省句容市后白中学九年级英语上册 Unit 4 Growing up Grammar课件 (新版)牛津版.ppt
- 江苏省如东高级中学2015-2016学年高二下学期阶段测试(一)英语试题 Word版含答案].doc
- 江苏省太仓市2015~2016学年第一学期期末教学质量调研测试初三英语试题含答案.doc
- 江苏省如皋市2013届高三下学期质量检测英语试卷.doc
- 2025中国冶金地质总局所属在京单位高校毕业生招聘23人笔试参考题库附带答案详解.doc
- 2025年01月中国人民大学文学院公开招聘1人笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2024黑龙江省农业投资集团有限公司权属企业市场化选聘10人笔试参考题库附带答案详解.pdf
- 2025汇明光电秋招提前批开启笔试参考题库附带答案详解.pdf
- 2024中国能建葛洲坝集团审计部公开招聘1人笔试参考题库附带答案详解.pdf
- 2024吉林省水工局集团竞聘上岗7人笔试参考题库附带答案详解.pdf
- 2024首发(河北)物流有限公司公开招聘工作人员笔试参考题库附带答案详解.pdf
- 2023国家电投海南公司所属单位社会招聘笔试参考题库附带答案详解.pdf
- 2024湖南怀化会同县供水有限责任公司招聘9人笔试参考题库附带答案详解.pdf
- 2025上海烟草机械有限责任公司招聘22人笔试参考题库附带答案详解.pdf
文档评论(0)