“柔性智能叶片”是风电技术的发展方向(国外英语资料).docVIP

“柔性智能叶片”是风电技术的发展方向(国外英语资料).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
“柔性智能叶片”是风电技术的发展方向(国外英语资料)

“柔性智能叶片”是风电技术的发展方向 Wind power technology, direction problem, flexible blade, breeze efficiency Flexible intelligent blade is the development direction of wind power technology Flexible blade, breeze, high efficiency fresh air power, technical breakthrough Our land 50 meters from the ground potential development height of more than 3 wind energy resources of about 2 billion 380 million kilowatts; in the face of such a huge wind energy resources, facing the situation of energy saving and emission reduction in China is serious, why more than 80 of Chinas wind power equipment manufacturers most idle capacity? Why is there a serious overcapacity? Statistics show that by 2009, Chinas wind power installed capacity of only 25 million kilowatts, wind power accounts for the countrys electricity consumption is still very small, installed capacity accounts for less than the amount of development, why wind power projects will be reduced to image project? Wind power is called garbage power Why is the development of wind power and demand so much contrast? The emergence of these contradictions and problems has seriously affected the development of wind power industry. The origin of these contradictions and problems is caused by the improper adaptation of wind power technology. China in the Three North (northeast, northwest, North China area) in the construction of the 6 million kilowatt wind power base, is still in the early construction of some of the problems have been prominent, the first is the installed capacity and power generation volume is low; followed by the grid problem can not break; and high failure rate, maintenance cost. These problems are mainly caused by the blade performance, the blades are designed and manufactured according to the helicopter, MW wind motor blade rigidity is very large, high performance requirements, high cost, has good aerodynamic performance. In the Three North region, although windy, but after all, the wind is very small, generally 2~3 - clas

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档