水泥仪器操作规程(国外英语资料).docVIP

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水泥仪器操作规程(国外英语资料)

水泥仪器操作规程 Operation regulation of cement paste mixer First, the use of operation 1, the power cord into the socket, red light on the power supply. Turn the torque switch to the automatic position, press the small button switch, then automatically complete a slow turn --- stop --- fast turn program. 2, if you place a twist on the manual position, then manual three bit switch to complete the action. If the handle is left and right, the handle can drive the stirring pan to move up and down along the dovetail guide rail of the upright column, move upwards, be used for stirring, and move downward to remove the stirring pot, and the stirring pan and the slide plate are rotated and locked by an eccentric groove. Two, matters needing attention 1. The working gap between mixing blade and stirring pot should be 2 + 1mm. 2, each time after use, should thoroughly remove mixing blade and mixing pot inside and outside residual paste, and clean scattered and flying in and on the mortar and stay in, dry, put on the shield, placed in the dust. 3, when the machine running, such as metal impact noise, should check the mixing blade and mixing pot gap is correct. 4, the use of mixing pot should be gently handle, not arbitrarily fall touch, in case the pot deformation. Operating rules for boiling boils First, the use of operation 1. Add water into the boiling pot to the required water level. Plug the four core into the socket on the program controller. 2. Turn on the power and the indicator light is on. 3, the machine set the signal program work, press the work button, the instrument began to heat up. 4, after the completion of the test, the instrument stopped working, turn off the power switch, about 5 minutes after the release of water, open the box cover, cool down to room temperature, take out the sample, the box after the evaporation of natural water, and then cover the lid. Two, matters needing attention 1. The water injection in the tank is usually 180mm, and the instrument should

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档