- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《公路安全保护条例》试题(外国英语资料)
《公路安全保护条例》试题
Highway safety protection regulations examination questions
Name: score:
First, fill in the blanks (1 points per minute, 10 points)
1. the Highway Safety Protection Ordinance shall come into force on July 1, 2011.
2. highway management institutions and road management enterprises shall establish emergency teams according to the emergency plans for highway accidents formulated by the competent department of communications and transport, and organize emergency drills on a regular basis.
3. no unit or individual may instigate or compel the driver of a vehicle to transport goods over the limit, and shall not obstruct the road traffic administration institution from conducting supervision and inspection in accordance with the law.
4. vehicles carrying goods vehicles goods cannot be dismantled, overall dimensions or total quality over the highway, highway bridges, highway tunnel limit set limit high limit length, width limit standards, required to be driving on the highway, highway bridges, highway tunnels, units and individuals engaged in transportation should be to highway management agencies for the highway overloading transportation license.
5. belongs to the highway, the highway construction control area from the outer edge of highway land from the outside of the standard of not less than 30 meters.
Two, RadioButtonList (a total of 40 questions, each question 1 points, a total of 40 points, multiselect, wrong did not score)
1, the scope of construction control areas for new or converted highways shall be determined and announced by the local peoples governments at or above the county level in accordance with these regulations within the period from the date of approval of the preliminary highway design (A).
A, 30 B, 20 C, 60 D, the same day
2, apply for road construction activities, construction units to the highway management agencies to apply. The highway management institution shall make a decision on whether to grant permission or not to grant it wit
文档评论(0)