PHC管桩基础施工常见质量问题的辨析(国外英文资料).doc

PHC管桩基础施工常见质量问题的辨析(国外英文资料).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PHC管桩基础施工常见质量问题的辨析(国外英文资料)

PHC管桩基础施工常见质量问题的辨析(国外英文资料) Analysis of common quality problems in construction of PHC pipe pile foundation Chen Xiao [Abstract] the quality problems for pile foundation construction in common, the causation and relevant measures for in-depth analysis and elaboration, to strengthen the pile foundation construction quality management, improve the quality of the project, provide reference for optimizing construction method. Pipe pile; construction design; control requirement; soil squeezing effect; pile spacing Pile failure, bored pile, clamping force, stress concentration 0 Introduction The PHC prestressed pipe pile foundation because of its short construction period, high bearing capacity of single pile, low cost, convenient monitoring, little influence on the environment and other advantages, in recent years has been widely used in Haikou, Sanya in the construction, many on the pile quality caused by this problem has attracted much attention. According to the construction experience of pile foundation engineering in recent years, the construction quality problem of pile foundation pile are not up to the design requirements of control; deviation of pile position and pile tilt rate exceed the standard; broken pile head; pile damage; single pile bearing capacity is not up to the design requirements. The author simply talks about the causes and Countermeasures of the pile failure in the construction of the tubular pile foundation. 1 the pile is not up to the design control requirement 1.1, the main reason why the pile fails to meet the design control requirements is that: 1.1.1 survey borehole density does not meet the requirements, the exploration report failed to provide accurate geological data; or the design selection of the bearing layer is improper or the design requirements are too high. When the 1.1.2 pile is sinking, the underground obstacle or the hard interlayer is thicker. 1.1.3 piling hammer is too small, or pile hammer is old, hammer free fall is not smoot

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档