PHC管桩基础施工常见质量问题的辨析(国外英文资料)
PHC管桩基础施工常见质量问题的辨析(国外英文资料)
Analysis of common quality problems in construction of PHC pipe pile foundation
Chen Xiao
[Abstract] the quality problems for pile foundation construction in common, the causation and relevant measures for in-depth analysis and elaboration, to strengthen the pile foundation construction quality management, improve the quality of the project, provide reference for optimizing construction method.
Pipe pile; construction design; control requirement; soil squeezing effect; pile spacing
Pile failure, bored pile, clamping force, stress concentration
0 Introduction
The PHC prestressed pipe pile foundation because of its short construction period, high bearing capacity of single pile, low cost, convenient monitoring, little influence on the environment and other advantages, in recent years has been widely used in Haikou, Sanya in the construction, many on the pile quality caused by this problem has attracted much attention. According to the construction experience of pile foundation engineering in recent years, the construction quality problem of pile foundation pile are not up to the design requirements of control; deviation of pile position and pile tilt rate exceed the standard; broken pile head; pile damage; single pile bearing capacity is not up to the design requirements. The author simply talks about the causes and Countermeasures of the pile failure in the construction of the tubular pile foundation.
1 the pile is not up to the design control requirement
1.1, the main reason why the pile fails to meet the design control requirements is that:
1.1.1 survey borehole density does not meet the requirements, the exploration report failed to provide accurate geological data; or the design selection of the bearing layer is improper or the design requirements are too high.
When the 1.1.2 pile is sinking, the underground obstacle or the hard interlayer is thicker.
1.1.3 piling hammer is too small, or pile hammer is old, hammer free fall is not smoot
您可能关注的文档
- 2014年河南省新乡市中考数学一模试卷 _20140612_170236(国外英文资料).doc
- 2014最新版德福考试必备复习资料大全(国外英文资料).doc
- 2014年历史会考知识点(国外英文资料).doc
- 2014考研英语图表作文写作方法和模板(国外英文资料).doc
- 2014高考物理考点汇总(国外英文资料).doc
- 2013年创业公司若何寻到最适合的人才(国外英文资料).doc
- 2015年内蒙古专业技术人员继续教育答案(大全)(国外英文资料).doc
- 2012年西班牙马德里国际电子、电子装置及照明产品博览会(国外英文资料).doc
- 2016年美国芝加哥日用品消费品展会(国外英文资料).doc
- 20国港口特殊规定简介(国外英文资料).doc
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)