- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一个土建工程师应掌握的基本数据(国外英文资料)
一个土建工程师应掌握的基本数据(国外英文资料)
The basic number of plays a civil engineer should master
I. The amount of concrete used in ordinary residential buildings and the amount of steel used:
1, multi story masonry house:
Reinforcement: 30KG/m2
Concrete: 0.3 ~ 0.33m3/m2
2, multi layer frame:
Reinforcement: 38 ~ 42KG/m2
Concrete: 0.33 ~ 0.35m3/m2
3, small high-level 11~12:
Reinforcement: 50 ~ 52KG/m2
Concrete: 0.35m3/m2
4, 17~18 floors:
Reinforcement: 54 ~ 60KG/m2
Concrete: 0.36m3/m2
5, 30 meters high, H=94 meters:
Reinforcement: 65 ~ 75KG/m2
Concrete: 0.42 ~ 0.47m3/m2
6, high-rise hotel style apartment 28 H=90 meters:
Reinforcement: 65 ~ 70KG/m2
Concrete: 0.38 ~ 0.42m3/m2
7 villa: the amount of concrete and the amount of steel between multi-storey masonry residential and high-rise 11~12 layers;
The above data are designed according to the seismic 7 degree zone rule
Two, ordinary multi-storey residential building construction budget economic indicators
1, outdoor doors and windows (excluding units, doors, security doors) area of 0.20 to 0.24 of the construction area
2, the template area accounts for about 2.2 of the floor area
3, the outdoor plastering area accounts for about 0.4 of the floor area
4, indoor plastering area accounted for 3.8 of the floor area
Three, construction efficiency
1, a plastering worker, plastering 35 square meters a day
2, a brick, 1000~1800 bricks a day
3, a brick, 800~1000 bricks a day hollow bricks
4, ceramic tile 15 square metre
5, scraping the first 300 square meters / day, second times 180 square meters / day, third times the pressure of 90 square meters / day
Four. Basic data
1 、 concrete weight 2500KG/m3
2, the weight per meter of reinforced 0.00617 * D * D
3, dry sand weight 1500KG/m3, wet sand weight 1700KG/m3
4, stone weight 2200KG/m3
5, one cubic meter of red brick about 525 pieces (wall thickness)
6, one cubic meter of hollow brick about 175
7, sieve one side clean sand, 1.3 square ordinary sand
Construction program song
Want to build effect is
您可能关注的文档
最近下载
- 假肢91课件讲解.ppt VIP
- 肥料登记行政许可事项服务指南.doc VIP
- 生物伦理学第五章+干细胞和再生医学.ppt VIP
- 开工报告电子版(2023版).docx VIP
- O型圈压缩量计算模板.xls VIP
- (高清版)DB33∕T 818-2024 城市道路交通标志标线及信号灯设置规范.pdf VIP
- 人美版美术七年级上册第一单元《第1课 赏书法之韵》课件.pptx
- 2025年最新部编人教版(统编版)初中语文九年级上册教学计划及进度表.docx
- 2025年1月浙江省普通高校招生选考科目考试仿真模拟卷03化学试题(解析版).docx VIP
- 荒湖农场100mw渔光互补项目实施方案.doc VIP
文档评论(0)