- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冲孔桩偏孔改正办法(国外英文资料)
冲孔桩偏孔纠正措施(国外英文资料)
An impact drill in Hunan karst area construction, pile diameter of 1400 27m deep hole, before a construction team in the exit card hammer and other factors after 18m drilling, the hole backfilled. After February, I took over the younger brother, before the technician did not tell me about the partial hole problem, only said the card hammer. I found in drilling to 16.5M has partial empty hole, the wire rope swing amplitude is very large, then throwing stones to rectify drilling hole, so repeated 7 days, drilled to 18.5 meters, although there is a single hole partial amplitude deviation has little to continue drilling to 20 meters from 18.5 meters to 20 meters long week, while drilling deviation, but the effect is getting worse, 20.4 meters of wire rope and orifice center deviation 30cm, there have been 90 cubic meters of rubble backfill, took 21 days. Again after 3 days, so repeated, still no effect. 21 meters to 24 meters, there is a layer of karst cave, must go through the cave to the cave, the bottom of the rock embedded more than 1.5 meters in order to end hole.
Backfill, after natural dense (15 days) manual excavation treatment.
Thank you. On the first floor, the site has previously had a hollowed out pile, which has been withdrawn from the site because of its abundant groundwater and pumping difficulties.
The strength of backfill and the rock rubble should strength similar to it, according to your data, you may be the development of drilling in karst limestone strata, this is hard because of the difference, so easy to deflect, so we should pay attention to when the rubble backfill, preferably stone fill high strength.
By way of rotary drilling hole, drill with rolling or ring cutting, design the drilling pressure and speed control, good footage, another two monitoring vertical direction, limestone formation is not a problem, but the cost is relatively high, tight for reference
Thank you for giving me advice, 3 floor, block stone is the streng
您可能关注的文档
- 中国南海题目之我见(国外英文资料).doc
- 中国医大2012年1月考试《护理伦理学》考查课试题(国外英文资料).doc
- 中国企业与国外LED封装技术的差异(一)(国外英文资料).doc
- 中国农药第一网(国外英文资料).doc
- 中国图书资料分类法(国外英文资料).doc
- 中国图书馆分类法(国外英文资料).doc
- 中国大学中的所有专业(国外英文资料).doc
- 中国学生申请美国商科的必备常识(国外英文资料).doc
- 中国密码“天才” 截译日本偷袭珍珠港(国外英文资料).doc
- 中国师长教师对美国顶尖名校本科专业选择存在误解(国外英文资料).doc
- 某区纪委书记年度民主生活会“四个带头”个人对照检查材料.docx
- 某县纪委监委2024年工作总结及2025年工作计划.docx
- 某市场监督管理局2024年第四季度意识形态领域风险分析研判报告.docx
- 县委书记履行全面从严治党“第一责任人”职责情况汇报.docx
- 税务局党委书记2024年抓党建工作述职报告.docx
- 某市税务局副局长202X年第一季度“一岗双责”履行情况报告.docx
- 副县长在全县元旦春节前后安全生产和消防安全工作部署会议上的讲话.docx
- 某市委书记个人述职报告.docx
- 某县长在县委常委班子年度民主生活会个人对照检查材料1.docx
- 某县长在县委常委班子年度民主生活会个人对照检查材料.docx
文档评论(0)