起重吊装作业流程及注意事项(国外英文资料).docVIP

起重吊装作业流程及注意事项(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
起重吊装作业流程及注意事项(国外英文资料)

起重吊装作业流程及注意事项(国外英文资料) The hoisting work shall be carried out in accordance with the operation procedures. In order to avoid any safety accidents, the lifting notice shall be noted and strictly observed by the lifting company. 1, all personnel involved in the construction, must be familiar with lifting methods and engineering content, according to the requirements of the project construction, and strictly implement the rules and regulations. 2, in the construction process, the construction staff must be specific division of labor, clear responsibilities. In the whole lifting process, we must conscientiously observe the order of the field, obey orders, listen to the conductor, and shall not leave the work station without authorization. 3, there should be a unified command signal during the hoisting process, all personnel involved in the construction must be familiar with this signal in order to coordinate the movements of the operation positions. 4. When hoisting, the whole scene is deployed by the commander in chief, and each post shall be in command. The command of the Chief Executive shall be properly carried out, and the signals shall be transmitted quickly and accurately, and shall be responsible for the scope of their duties. 5, in the entire construction process, to do on-site cleaning, removal of obstacles, in order to facilitate operation. 6, the construction personnel who participate in climbing operations, must pass the physical examination qualified, operating with safety belts, and tied in a safe position. Tools should be secured and shall not be thrown at will. 7, construction personnel must wear a safety helmet, such as winter construction, should be put down protective ears, so that the hearing is unimpeded. 8, live welding wire and wire to stay away from the wire rope, live line distance should be maintained at more than 2 meters, or with protective rack, welding wire and wire rope crossing should be separated from, strictly prohibit contact. 9, the

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档