- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
重庆李家沱长江大桥(国外英文资料)
重庆李家沱长江大桥(国外英文资料)
Chongqing lijiatuo Yangtze River bridge, also known as the Chongqing Yangtze River Bridge, located between the western city of Chongqing industrial district lijiatuo and Jiulongpo, a total investment of 730 million yuan. The total length of the project is 10241 meters, including 5 large and medium bridges, 4 overpasses and 2 tunnels. The bridge length of 1350.11 meters (including South Beiqiao, Taiwan), the main bridge is a concrete cable-stayed bridge with double cable plane prestressed Twin Towers, the span arrangement is 53m + 169m + 444m + 169m + 53m, H cable tower 115.5m high-strength steel wire cable, concrete beam. The full width of 24 meters, two-way 4 lane. The bridge started in 1991 and was opened to traffic at the end of 1996.
Located between Chongqing Jiulongpo District and Banan District, the south side of the bridge to lijiatuo Industrial Zone (Banan District), to the north shore of Jiulongpo district. The main hole length 1288m, span combination is: transition hole (53m) + main hole (169m+444m+169m) + transition hole (53m) + south approach bridge (8x50m), the bridge width is 4 lanes (intermediate set of separation zone), wide 24m. It is the largest cable-stayed bridge in China with two symmetrical cable planes (also called double cable planes) on both sides of the superstructure.
The structure of the bridge is Twin Towers double cable plane prestressed concrete cable-stayed bridge, and the tower and pier are consolidated. The vertical suspension system, transverse limiting device is arranged at the intersection of tower beam, in the transition to North and south approach hole with large displacement to set the amount of expansion joint.
The main beam adopts flat solid double beam section, the main beam is 2.5m high and 1.7m wide. The cross beam spacing is 4.5m, and the transverse prestressing steel beam is arranged. A longitudinal prestressed steel beam is arranged at the middle section of the main beam in the middle part of the mid
文档评论(0)