11年市政真题及答案(国外英文).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
11年市政真题及答案(国外英文)

11年市政真题及答案(国外英文资料) 2011 Zhenti and answers a construction division of Municipal Engineering (text version) Online: Gufen 2011 construction of a division of municipal engineering Zhenti Gufen Online First, individual choice questions (20 questions, 1 points each). Each item options, only 1 of the most to do) 1. in the construction of the post tensioned prestressed concrete beam with conventional grouting technology, the minimum part of the curved prestressed duct should be set up. A. grout hole B. overflow hole C. vent D. drain hole 2. is the water jet auxiliary means of pile construction is (soil). A. sand layer B. crushed stone soil layer C. cohesive soil layer D. gravel soil layer 3. the statement about the closure of concrete continuous beams is wrong. The order of closure of A. is generally the first span, the second span, and the middle span The length of B. closure shall be 2m C. should be closed during the day when the temperature is highest The strength of concrete in D. closure section shall be increased by one grade 4. about the span 15m cast-in-place arch ring, the correct is (). Subsection pouring shall be adopted in A. B. when the expected arch deformation hours by interval should be pouring C. pouring shall be completed prior to the initial concreting of arch foot concrete D. longitudinal long steel shall not be used 5., about the precipitation of the foundation pit, the correct is (). A. precipitation is mainly used to improve soil strength B. dewatering well shall be arranged on the inner side of the foundation pit C. in order to ensure environmental safety, we should adopt the recharging measures D. precipitation depth is 7m, must be used for dewatering 6. the following period of road engineering construction quality assurance measures, which belongs to the construction requirements of the surface layer is (). A. the day after digging, filling, pressure, leaving troubles B. how much, how much, how much, and how much C. should be 2% to 3% horizontal

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档