- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
成本会计ABC型题与答案
Fallow Limited manufactures 3 products. They are made in a production facility which is common to all 3 products.
Production overheads incurred for year 5 were £238,000.
The following cost drivers have been identified for certain production overheads:
Cost drivers Cost pool for year 5
£
Direct labour hours 94,080
Number of production runs 3,969
Machine operating hours 88,650
Packing and dispatch documentation and
Administration (number of orders) 21,750
A cost pool is a summary total of those cost which are considered to be attributable to a particular cost driver.
Packing and dispatch documentation is treated as the final stage of production operations. Production overheads not identified with a specific cost driver are charged to products on a basis of machine hours.
Details of the 3 products for the year were:
XR1 XR2 XR3
Unites made and sold 1,000 3,500 2,400
Direct materials per unit £25.75 £12.65 £20.55
Direct labour per unit £12.90 £15.48 £32.25
Direct labour hours per unit 3.60 4.00 2.00
Machine operating hours per unit 4.00 6.00 6.00
Batch size of each production run 10 20 60
Number of despatches 105 360 285
Required:
Calculate:
The production cost of an order for 2 units of XR3, absorbing all production overheads on a basis of the aggregate of direct labour and machine hours.
Absorption rates for each cost pool, using the cost drivers indicated.
A revised production cost for the order referred to in (a), using the rates calculated in (b).
Answer:
Direct labour hours
£94,080.00
Production runs
£3,969.00
Machine operating hours
£88,650.00
Packing and dispa
文档评论(0)