2012河北省地测防治水质量标准化(2012, Hebei province to prevent and control water quality standardization).docVIP

2012河北省地测防治水质量标准化(2012, Hebei province to prevent and control water quality standardization).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012河北省地测防治水质量标准化(2012, Hebei province to prevent and control water quality standardization)

2012河北省地测防治水质量标准化(2012, Hebei province to prevent and control water quality standardization) Seven, the ground water control Article 1 the following conditions must be met for the prevention and control of water safety and quality standardization: To set up the hydrogeological surveying management department and deputy chief engineer of the mine, geological and hydrogeological conditions of complicated coal mine 1. coal and gas outburst, coal mine and mine hydrogeological condition is complex and complicated to set up special institutions for the prevention and control of water. 2., no direct responsibility for major engineering accidents (such as: affect a mining area above water seepage accident, major roadway project accident and through lane casualty, etc.). Second checks and grading methods The quality control of water quality measurement is standardized, and the assessment grade is divided into three grades. Level 1: 90 points and above; Two: 80 points and above; Three: 70 points and above. In the field of water prevention and control, 1 people will be deducted 10 points each; and the ground water, basic data, statements, etc. shall be falsified or falsified, and shall be reduced or cancelled. The scoring system adopts the deduction method, and all the individual items and sub items are deducted so that there is no negative score. Third check and score reference form Schedule 1: ground water quality control standards, equipment standards, equipment parameters table Schedule two: reference table for professional technical personnel for ground water control and Prevention Standardized standards for water quality prevention and control and rating scales for ground water logging Items and standards, standard scores, check points, points, points Cause score I. technical management 4 1: the scope of Regulations Department, team responsibilities and personal responsibility of the production safety system, disaster prevention technology management system the measurem

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档