区属编号(Location).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
区属编号(Location)

区属编号(Location) Location: Categories: Ningbo civil defense project Plan for the transformation of the platform Engineering name: Management unit: Design unit: October 10 second О О seven years Orders to record Chapter I project overview The second chapter is the translation of the translation and the content of the conversion 2.1 the translation of the plain war 2.2 change the work content in each time period Chapter iii analysis table of the translation project Chapter iv the list of main equipment, materials and labor 4.1.1 civil parts 4.1.2 the wind section 4.1.3 water supply part 4.1.4 electrical parts 4.1.5 labor summary Chapter v the implementation agencies and responsibilities of the peacetime transformation 5.1 organization 5.2 responsibilities of the organization Chapter vi plan for the implementation of the plan for the transformation of the plain war 6.1 manpower, materials and mechanical protection plan 6.2 plan for the implementation of the period 6.3 technical measures for the transformation of the plane Chapter vi project budget Chapter 7 the transformation of the construction plan Chapter I project overview Should include: (1) location of the project, completion time, construction, design, construction and management unit; (2) simple description of ground building: engineering nature, total area, basement area and number of floors; (3) overview of human defense projects: A, area, grade, peacetime and wartime purpose; B. Condition of evacuation port (main and secondary entry: width, form and azimuth); C) the main design parameters and the equipment are in place in the professional (construction, wind, water and electricity) of the engineering. (4) the use of functions, area and management; (5) see appendix 1: the human defense engineering overview sheet Chapter ii the translation of the plain war and the main items 2.1 the translation of flat wars: 2.1.1 civil engineering professional to wartime installation main projects: usually gateway block in wart

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档