工程测量期末考试卷及答案(Final examination paper and answer).doc

工程测量期末考试卷及答案(Final examination paper and answer).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程测量期末考试卷及答案(Final examination paper and answer)

工程测量期末考试卷及答案(Final examination paper and answer) 2011-2012 autumn Fill in the blanks,  will proper words to fill in line. A total of 20  1, the north and south direction measurement using plane rectangular coordinate system based on the longitudinal axis of the X axis  to things in the direction of the horizontal axis for the Y axis. 2. The basic work of measurement is high difference measurement, horizontal Angle measurement and distance measurement. 3  field measurement datum is plumb line  datum is the geoid. Measuring work in the industry of datum line is normal  datum is rotating   reference ellipsoid. 4, at present our country 1985 national height datum to benchmark the origin of the height of 72.260 m   level The standard English symbol BM. 5, ground point to assume that the geoid The vertical distance is called the relative elevation  this point A point on the geoid  the absolute elevation of point A is zero. 6, leveling point was defined as elevation after   known points in turn point is passed elevation point. 7. Telescopic visual axis refers to the connection of the intersection of objective and cross wires. 8. The purpose of the rotating objective for the operation of the instrument is clear. The purpose of rotating eyepiece to light spiral is clear cross. 9  in the process of the theodolite is the place for the purpose is to instrument center and measuring  on the site is located in the same vertical line The purpose of leveling is vertical axis lead vertical, horizontal disk level. 10, A level measurement known point A height of 241.000 m  before reading of 0.938 m  after reading of 1.438 m  Point B of the height of 241.500 m  the line of sight of instrument height is 242.438 m. Over a horizontal Angle of the 11, back to measuring  need to target readings are starting to plate processing  180 ° / n In order to eliminate the error caused by uneven plate drawing. , poor vertical plate index X 12  but belong to instrument error mea

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档