- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
江苏省建筑安全考核(Jiangsu provincial building safety assessment)
江苏省建筑安全考核(Jiangsu provincial building safety assessment)
Safety officer C test question
Single topic selection:
1. If the wetland area is excavated, it can be excavated for artificial precipitation when it is lowered to the bottom of the pit (0.5 to 1.0 meters).
When digging in the expansive soil area, do a good job (drainage) before excavation.
3. When the reinforced concrete filling pile is used, the excavation standard is the pile body concrete (after the design strength).
4. When the earthwork is excavated manually, the operation spacing of the two should be kept (1 m).
5. The shield structure should test the concentration of combustible gas every day, to predict the prevention and control work, and to do well (to record the account).
6. The drainage ditch and the collecting well should be set in (beyond the base range).
The deviation jack in the tool tube should be insulated, and the electric high pressure oil pump should be used (wearing insulating gloves).
8. The excavated vehicles should be guided, strictly prohibited.
9. The top of the top tube shall exceed (50 m) to prevent hypoxia and suffocation.
10. Construction of the top tube. Oxygen in pit and acetylene cylinder (must not enter the pit).
11. The lighting telecommunication system in the pipeline is generally used (low voltage).
The supporting installation must be carried out in the order of the (slotting support).
13. The removal of support shall be constructed in the order of (after being replaced).
14. The base pit test datum should not be less than (2).
The template and its stents must be set in the installation process (the temporary fixtures that can effectively prevent capsizing).
16. The minimum height of the operating platform for the template installation must be (2.0 m).
17. Set horizontal scissor support when the bracket is higher than (4.0 meters).
18. During the operation of the suspended part, the operator should (fasten the seat belt).
The minimum distance of a template in the foundatio
您可能关注的文档
- 放射医学中级考试复习(Review of secondary examinations for radiology).doc
- 政务公开文章(Government affairs).doc
- 放射医学技术专业初级(士)卫生专业技术资格考试(The examination of the technical qualifications of radiomedicine technical major (shi)).doc
- 故事化_圆明园_成功的秘诀(Story _ the secret of success).doc
- 搅拌桩、静压桩(Mixing pile and static pile).doc
- 效果图提高渲染速度(Rendering speed up rendering).doc
- 故乡的晨雾-散文(黄毅明)(Morning mist of hometown - prose (huang yiming)).doc
- 摇臂使用技巧和注意事项(分享给和我一样想了解学习摇臂的人)(Use tips and precautions (share to people like me who want to learn about rocker arms)).doc
- 教你如何乘坐火车卧铺,这个绝对可以有(How do you get on a sleeper train).doc
- 教你如何更好维护电脑(How do you better maintain your computer).doc
- 江苏财经职业技术学院毕业设计(Graduated from jiangsu university of finance and economics).doc
- 江都市小学三年级音乐(下)教学计划(Third grade music (lower) teaching plan of jiangdu primary school).doc
- 江门市城镇医保方案(Jiangmen town health insurance scheme).doc
- 污水泵软启动故障的处理(Treatment of soft start failure of sewage pump).doc
- 污泥浓缩池的设计规定及数据(Design requirements and data of sludge concentration pond).doc
- 汤(匙)本三个小故事(Soup three little stories).doc
- 汽修理论)(Theory of vaporizing).doc
- 汽修技术服务(Auto repair technology services).doc
- 汽机专业(Turbine professional).doc
- 汽机基础(Dynamics,).doc
文档评论(0)