116管道及设备的保温施工工艺(116 piping and equipment insulation construction process).docVIP

116管道及设备的保温施工工艺(116 piping and equipment insulation construction process).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
116管道及设备的保温施工工艺(116 piping and equipment insulation construction process)

116管道及设备的保温施工工艺(116 piping and equipment insulation construction process) 1 range The process standard is applicable to the heat preservation and water supply and drainage pipes of heating and living hot water or steam pipes and equipment. 2 construction preparation 2.1 material requirements: The properties and specifications of 2.1.1 insulation materials shall comply with the design requirements and have the qualification certificate. Commonly used materials are: 2.1.1.1 pad: foam concrete prefabricated, perlite, vermiculite, asbestos tile, etc.. 2.1.1.2 shell and tube products: rock wool, slag cotton, glass wool, rigid polyurethane foam, polystyrene foam pipe shell, etc.. 2.1.1.3 coil: polystyrene foam, rock wool and so on. 2.1.1.4 other materials: galvanized wire, asbestos ash, or above with prefabricated plate masonry or bonding etc.. 2.1.2 protective shell material, asbestos cement, lime or hemp, hemp; glass cloth, plastic cloth, Jin Liqing sack cloth, linoleum, oil industrial cloth, aluminum foil, metal etc.. 2.2 main machines and tools: 2.2.1 machines: abrasive saw, electric welder. 2.2.2 tools: steel, cloth cut, chop, hammer, hook, shovel, ash bucket, flat trowel, circular trowel. 2.2.3: steel tape, steel needle, ruler, wedge feeler etc.. 2.3 operating conditions: 2.3.1 piping and equipment insulation should be in the anti-corrosion and water pressure test can be carried out before, if you need to do insulation layer, should be the pipe interface and weld left, until the hydraulic test qualified, and then the interface insulation. Ceiling and well 2.3.2 buildings in need of pipeline insulation, pressure test must be qualified in anti-corrosion, insulation complete inspection qualified after construction can be hidden, finally closed, do not reverse the process of construction. 2.3.3 insulation must be well within the waste debris to clean up the debris left by the process of the construction, should be kept clean, to ensure smooth drainage. 2.3.4 wet work of

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档