高空作业施工方案(High altitude work construction scheme).docVIP

高空作业施工方案(High altitude work construction scheme).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高空作业施工方案(High altitude work construction scheme)

高空作业施工方案(High altitude work construction scheme) The wall is a vertical component of the building, but the design, construction, material, use and other factors can cause cracks in the wall, causing leakage. The method for the treatment of the wall is to repair the waterproofing of the original structure, and its function is to disperse the water. When the cavity construction is partial damage, it is better to use restorative repair. Repair with waterproof material: this method can be used widely, that is, the water seeping into the indoor part adopts the oil solution or the water-proof waterproof material, the sealing or painting method. Waterproof measures are taken on the outside of the wall panel. The wall is covered with water: the waterproof material is adopted in the side part of the external wall, and the rainwater is blocked by waterproof material. The companys construction strength of high altitude operation, to all kinds of waterproof and repair works have professional technicians to the site to survey, divide, and develop the construction plan. Therefore, it is not necessary to set up scaffolding for the high - rise wall water leakage. Second, the metope of architectural coatings construction: new metope paint construction: the ground floor of the building exterior wall coating requirements enough curing period, the new water slurry concrete surface must pass a reasonable maintenance time, let the base vomit, fully dry. The underlying surface should be dry, firm and firm, and should not be defective, such as sand, crack and loose. Construction method: the exterior wall coating is not suitable for the large area batch to scrape putty, the putty layer should not be too thick, the material USES polymer cement putty. It is usually applied to the base coat, and it is applied twice. According to the engineering quality requirement, the surface can be added to the surface. The coating construction is usually carried out from top to bottom, and each brush should

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档