基础设施工程简介(Introduction to infrastructure engineering).doc

基础设施工程简介(Introduction to infrastructure engineering).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基础设施工程简介(Introduction to infrastructure engineering)

基础设施工程简介(Introduction to infrastructure engineering) Brief introduction of infrastructure construction project I. engineering name: * * * Two. Date of start: * * * * * * Three 、 design unit: * city construction and Design Institute Four, supervision units: * * * * Ltd. Five 、 construction unit: * * * * Co., Ltd. Six, audit unit: * * Engineering Cost Consulting Co., Ltd. Construction content 1. East extension of * Street 1, X Street East extension section West with Tianmen Avenue, terminus k4+160, east to * branches, the road length of 540.60 meters. Mainly include: Road, rain, sewage and power lines. 2, * Street East extension road red line 50 meters, the roadway 20 meters, 10 meters wide green belt on both sides of the. The roadway asphalt concrete pavement asphalt concrete +5cm 4cm fine grained asphalt concrete; gravel roadway +16cm cement stabilized gravel cement stabilized macadam cement stabilized base +16cm 16cm; subgrade by heavy compaction; kerb length of 1103 meters. 3. The rain pipe is located in the green belt 13 meters away from the middle of the road. Both sides are laid at the same time. The west is from k4+240 to * branch, and the branch is discharged into the Victory Canal, and the actual completion is 976 meters. Rainwater pipe adopts reinforced concrete II tube, the specification is 2000cm * 600cm, steel wire mesh, cement mortar coating, using 120 degrees foundation, the actual completion of inspection wells 25. The crossing pipe is made of reinforced concrete II tube with specifications of 2000cm * 1000cm, double grate and water inlet 23. 4, the sewage pipe is located in the south side of the green belt, 17 meters away from the road midline, the actual completion of the West from k4+240 to * branch sewage main road, the actual completion of 450 meters. The sewage pipe is made of reinforced concrete II pipe, the specification is 2000cm * 500cm, steel wire mesh and cement mortar are applied, 120 degrees foundation is adopted, and 13 inspection wells

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档