- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安全文明施工费(Safe and civilized construction cost)
安全文明施工费(Safe and civilized construction cost)
Forwarding the notice of the Ministry of construction on the construction safety protection, civilized construction measures, expenses and the use and management regulations
Wuhu City [2006] 208
All concerned units:
In order to strengthen the safety and civilized construction management, guarantee the construction personnel working conditions and living environment, ensure safe production and civilized construction funds in place, to prevent the occurrence of accidents in the construction, the Ministry of construction construction safety protection, civilized construction measures and the use of cost management regulations (build do 2005 89 No.) forwarded to you, and combined with the actual situation of our city, put forward the following opinions, please follow.
A, construction safety protection, civilized construction measures fee is in accordance with the current national construction safety, construction site environmental and health standards and the relevant provisions of the cost of the purchase and replacement of construction safety equipment and facilities, improve the conditions for safe production and operation environment needed. Please see the attached list of safety protection and civilized construction measures.
Two, according to the Anhui province construction installation engineering cost quota (2000), Anhui province construction cost valuation quota and other regulations, Anhui province construction safety protection and civilized construction rate in Annex 2.
Three, according to Annex 2 Calculation of safety protection, civilized construction measures fee, not including the safety protection and civilized construction have special requirements and high risk project to increase the safe and civilized construction measures and scheme demonstration, review and other expenses, as well as the construction units have the other requirements of the cost of the construction of security and civilization constru
您可能关注的文档
- 三级服务标准(Three level service standard).doc
- 七月十五烧纸钱风俗(In July fifteen the custom of burning paper money).doc
- 三基试题名词解释(Three questions Glossary).doc
- 三轮推进,稳扎稳打,知能并重,争创辉煌(Three forward, steady, knowledge of both, create brilliant).doc
- 三角函数_8-47(Trigonometric function _8-47).doc
- 上市遇挫急缺钱 太古220亿变卖资产(Swire listed setback so short of money selling assets 22 billion).doc
- 七年级地理下册复习要点(Grade seven geography book review points).doc
- 上财03考研西经试题与答案(Under 03 PubMed West through questions and answers).doc
- 上海(Shanghai).doc
- 专业压限器的使用技巧(Professional pressure limiter using skills).doc
文档评论(0)