空间转换_广州城市建设以新区为重点的新设想(A new idea to the new district as the focus of the space construction of Guangzhou city _).docVIP
- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
空间转换_广州城市建设以新区为重点的新设想(A new idea to the new district as the focus of the space construction of Guangzhou city _)
空间转换_广州城市建设以新区为重点的新设想(A new idea to the new district as the focus of the space construction of Guangzhou city _)
Space transformation: urban construction in Guangzhou
New concept of new area as key point
Sheng
Urban infrastructure for urban operation and development
As a fundamental role, infrastructure construction must begin
Yes, the scale and speed of its development are in line with the development of economy and society
Than must advance, otherwise it will restrict the economic and social development
Exhibition. However, for many years, the urban infrastructure in Guangzhou has been stagnant
After development, the difficulties, a lot of outstanding. Investigate its origin
Because, in addition to the low investment proportion and other reasons, the basic design
Construction is mainly carried out in the old city, is also a major
Reason。 The transformation of old urban areas and the development of new zones?
After that, it has been one of the difficult problems in urban construction. This paper
Put forward some ideas.
One, change in situ, catch for easy lead
No way out is to shift the focus of urban construction from the old city
New District
The source of development funds for the renovation zone is land
The land must be exchanged from the physical form of exchange to the goods
Currency transaction transition
With i~2 five year plan time to accommodate
A new population of millions is entirely possible, then
Rebuilding the old city
Over the years, the construction of infrastructure in Guangzhou is mainly
Put on the old city area, which is to ease the old city faces
The problems play a positive role, but also long-term debts
Emergency measures taken after the delay. But the old city
The population density is high, the building density is high, and the traffic density is high
High, the original relationship is complex, difficult to reason
Therefore, infrastructure investment is mainly in the old urban areas
There are many disadvantages.
(1) poor investment returns.
您可能关注的文档
- 工厂管理规章制度(Factory management rules and regulations).doc
- 工商银行网上贵金属t+d协议(ICBC precious metals t+d agreement Online).doc
- 工程测量试卷a卷期末试题(Engineering survey paper, a volume, final examination questions).doc
- 工程量清单与定额计价模式比较(Comparison of bill of quantities and fixed valuation model).doc
- 工程项目建设施工进度计划格式(Format of construction schedule for engineering projects).doc
- 巴菲特--我为何不看好美元(Buffett - why don't I look at the dollar).doc
- 工程预算知识(Engineering budget knowledge).doc
- 帕麦斯顿(palmerston).doc
- 带钢(Strip steel).doc
- 常用短语(Useful Expressions).doc
最近下载
- 电力调度数据网络接入技术规范及网络拓扑图.doc VIP
- ZZGA高频开关整流器使用说明书.doc
- 危重患者院内转运PPT.pptx VIP
- 匀变速直线运动的速度与时间的关系课件 2024-2025学年高一上学期物理人教版(2019)必修第一册.pptx VIP
- 《科学发展观》课件.ppt VIP
- 匀变速直线运动的位移与时间的关系 课件 -2024-2025学年高一上学期物理人教版(2019)必修第一册.pptx VIP
- 2022年西安市灞桥区事业单位考试真题.docx VIP
- 【课件】匀变速直线运动的位移与时间的关系+课件高一上学期物理人教版(2019)必修第一册.pptx VIP
- 2024西安市灞桥区事业单位考试笔试题库及答案.docx VIP
- 福建专升本 “三个代表” 重要思想(思维导图).pdf VIP
文档评论(0)