- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程测量1(Engineering Survey 1)
工程测量1(Engineering Survey 1)
Preparation before building construction survey:
1 Preparation: understanding the relationship between the building and the known building; the size of the construction building
2 site visit: terrain, topography, surveying control network etc.
3. Determine the design plan: design methods, instruments, accuracy requirements, timing
4. Check the survey data
The difference between high speed rail and traditional railway:
1. High speed railway assembly line engineering survey and track system construction survey are carried out under different coordinate standards
2. High speed railway control survey line, engineering survey control network and track control network
3. High precision required
4 、 high-precision GNSS receiver / intelligent total station / digital level and track detector and other precision measuring instruments are widely used in high-speed railway construction
Characteristics of construction control network:
1 、 high precision, small control range and large density of control points
2, according to the size of the project, can be divided into two stages or multistage network, the secondary network precision possible than the head high
3. Control points are frequently used and subject to construction interference. Regular retest is required
4. In order to coordinate calculation and construction lofting, the coordinate system of control network is in accordance with the construction coordinate system
5. In order not to make the projection correction and easy to set out, the projection surface is consistent with the average elevation surface
Slope line survey:
Method: in AB into two inclined stakes, if A point elevation is known, in the A point placement level, with the general method of measuring B elevation in AB between 1 and 2, 3, 4, a foot screw in the direction of AB, the other two foot spiral line roughly the AB line and vertical measuring instrument of high I, with a telescope aimed at the level of B points feet, foot s
您可能关注的文档
- 太极宗师金仁霖论太极拳的练法(Tai Chi Master Jin Renlin on Taijiquan training).doc
- 太极拳运劲发力规律(Tai Chi strength force law).doc
- 太空船月球(Spaceship moon).doc
- 太湖北部夏季浮游藻类多样性与水质评价(Phytoplankton diversity and water quality assessment in northern Taihu in summer).doc
- 太阁5能力培养大法(Our 5 ability training method).doc
- 太阳能上水须知与技巧(Notes and techniques for solar water supply).doc
- 太阳能公司(Solar energy company).doc
- 太阳能制造厂家(Solar manufacturers).doc
- 太阳能科技论文新能源开发利用论文能源科学导论论文云南太阳能热水(Solar energy science and technology paper new energy development and utilization paper Energy Science Introduction Yunnan solar hot water).doc
- 太阳能发电硬件设计(Hardware design of solar power generation).doc
- DB15_T 4135-2025 消防安全重点单位消防安全标准化管理规范.pdf
- LY_T 3380-2024 聚烯烃薄膜饰面木质地板.pdf
- LY_T 3425-2025 林草有害生物标本制作与保藏规范.pdf
- LY_T 3364-2024 柔性竹塑复合材.pdf
- [V版]破解英语单词的密码:词根、前缀、后缀_江正文_化学工业_2017.1.pdf
- DB62T 694-2001 紧凑型玉米杂交种生产技术规程.docx
- DB62T 723-2001 玉米杂交种凉单4号.docx
- WS_T 848-2025 末梢血标本采集指南.pdf
- 2015CPXY-J345 飞拓RFT建筑用真空绝热板(条)建筑保温系统.docx
- DB62T 696-2001 天水市北道区晚熟红、黑葡萄栽培技术规程.docx
最近下载
- (正式版)D-L∕T 700-2017 电力物资分类与编码导则.docx VIP
- 精品解析:2025高考全国一卷语文(原卷版).pdf VIP
- 初中信息技术课堂教学中学生编程思维的培养研究教学研究课题报告[001].docx
- 起重吊装专项施工方案最终.doc VIP
- LVDT线性位移传感器的设计.pdf
- 人教版四年级数学上册第三单元《角的度量》(大单元教学设计).docx VIP
- 电力网络分析软件:OpenDSS二次开发_(2).电力系统建模方法.docx VIP
- 2025至2030年中国卡车行业市场运营格局及未来前景分析报告.docx
- 中医药适宜技术培训试题及答案.docx VIP
- 监理合同居间协议书.docx VIP
文档评论(0)