沟下焊和沟上焊(Groove welding and groove welding).docVIP

沟下焊和沟上焊(Groove welding and groove welding).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沟下焊和沟上焊(Groove welding and groove welding)

沟下焊和沟上焊(Groove welding and groove welding) In view of the characteristics and address characteristics of long distance pipeline project, the groove welding method is adopted in the pipeline welding construction. Compared with the groove welding, the construction difficulty of the joint and the collision mouth are reduced, and the frequent diversion of the pipe hanging machine in the lower ditch is avoided, and the comprehensive efficiency is improved. The main process for welding ditch: measurement line, scan line, pipeline excavation, retest, piping, group, preheating, welding, weld flaw detection, strength and tightness test, mending, spark detection and mending, backfill. It should be pointed out that it is very important to improve the organization and the reasonable matching of technical workers in various fields during construction. Groove welding construction scheme The groove set is big in welding space and easy to operate. The welding quality is guaranteed, and the whole pipe section has a certain length, and the pipe section is used The natural curvature of the excavator can be efficiently lowered by using the excavator. 4. process flow and operation points 4.1 sweep line pushing operation belt: measuring and laying off line group to welding groove excavation to pipe ditch cushion to pipe down ditch to local backfill pressure test to whole backfill 4.2 process description 4.2.1 scan line push operation zone: a large diameter pipeline (more than 1000mm) construction requirements for the operation bandwidth of not less than 15 meters, 5 meters for a predetermined tube side cloth pipe, side 10 meters left on earth piled up around unity, try not to appear across the operating band phenomenon. 4.2.2 Measuring and laying out: the design requirement of sewage pipe is not over 80 meters. The inspection well shall be set up. In order to facilitate construction and reduce cost, it is suggested that the whole pipe multiple shall be used as the check interval, and the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档