- 1、本文档共20页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土建房屋工程施工放线(Civil housing construction line)
土建房屋工程施工放线(Civil housing construction line)
Civil / housing project construction line is started from the positioning of the building, until the main project can not be separated from the construction line.
It can be divided into three stages: building location (laying out), foundation construction (caving) and main construction (caving).
A, building location, is the first line of the housing construction project after the start of the building, personnel positioning is: in the city planning department (survey team affiliated) measurement personnel and construction units (Professional), positioning according to the construction planning of location map, finally formed at the construction site (at least) 4 positioning pile. The wiring tool is total station instrument or advanced theodolite.
Two, basic construction line, building location pile set, by professional surveyors, the construction unit of the construction site and the person in charge of the project on the basis of mutual supervision and measurement on line review (supervision personnel is mainly on-site supervision and verification), positioning the last released all the buildings pile axis (according to the building size or axis on line), all interval axis positioning pile is according to the positioning planning departments of the pile (at least 4) and the bottom of the building construction plan to put the line. The wiring tool is theodolite.
After the completion of the foundation positioning, the surveyor and the builder at the construction site will release the foundation line according to the axis of the location, so as to carry out the foundation excavation. Line tools: theodolite, Longmen plate, rope, wire pendant, steel tape etc.. Small works may have no surveyor, or a builder.
Note: the base axis shall be located in the permanent building or fixture around the proposed building while the foundation line is laid out to prevent damage to the axle locating pile and be used to remedy it.
Three, the c
您可能关注的文档
- 口腔组织学分章复习要点(Review of oral tissue credits).doc
- 口腔溃疡食疗方(Oral ulcer therapeutic diet).doc
- 发廊店长会犯的错误(The mistake made by the salon manager).doc
- 口译笔译分类词汇--常用称谓词汇(Interpretation, translation, classification, vocabulary -- commonly used terms and phrases).doc
- 口语学习方法总汇(Oral English).doc
- 口语 - 副本(Spoken copy).doc
- 古人歌咏金莲的诗词歌赋戏剧(中国风系列)(The ancients sang the poetry, ode and Drama (Chinese Wind Series) of the Golden Lotus).doc
- 口才练习素材(Eloquence exercise material).doc
- 古今图书集成(Integration of ancient books and books).doc
- 古代复姓大全(The ancient surname Daquan).doc
最近下载
- 新22J01《工程做法》(新疆图集).pdf VIP
- 2015-2022年河北省专接本(专升本)《英语》真题合集.pdf VIP
- 【GB_T50779-2022 】石油化工建筑物抗爆设计标准.docx VIP
- 蓄电池内阻试验报告.docx VIP
- 《成本与管理会计(第4版)》习题答案 孙茂竹.pdf
- 劳动合同模板正规【5篇】.docx VIP
- 电气控制与PLC技术应用教学教案.docx VIP
- 22K311-5 防排烟系统设备及部件选用与安装.docx VIP
- 2025青海省从优秀村(社区)党组织书记中考录乡镇公务员32人笔试模拟试题及答案解析.docx VIP
- 最新河北省建设工程竣工验收报告6份(市政基础设施工程).pdf VIP
文档评论(0)