- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
块石片石区别(Stone rubble difference)
块石片石区别(Stone rubble difference)
Stone, by blasting or wedge mining thickness not less than 15cm
Stone, by the rock or chop into chunks of rock, shape of the founder, roughly flat, thickness not less than 20cm, the width is about the thickness of 1 to 1.5 times, the length is about the thickness of 1.5 ~ 3 times.
Stone, and the stone asked almost, but the thickness is 7~25cm, and each side bump height of not more than 10mm
1. phenomena
The retaining wall does not leave the drain L, or the discharge hole is blocked or the wall is discharged. The fL drain is made of hydrophobic layer or drainage slope
Enough, earth in serious water retaining and water retaining wall at the same time, the internal force increased significantly, causing wall tilt
Deformation, cracking, or even collapse.
2. cause analysis
(1) the drainage hole is not kept according to the drawing requirements, or the method of retaining hole is wrong and causes blockage.
(2) the hydrophobic layer has not been laid out according to the construction specifications or drawings.
(3) the inner wall does not make the flashing slope in accordance with the regulations, construction materials and soil residues at the foot of the wall is not cleared.
3. preventive measures
(1) masonry retaining walls shall be provided with drain holes according to the design requirements. The drainage hole should adopt the method of retaining sleeves and check.
Whether the water outlet is unblocked or not, and if it is blocked, it should be cleared or repaired in time.
(2) in the backfill after the wall, the drain hole and the surrounding area shall be used as the drain layer
On the horizontal surface of the drain hole, loosen 30cm, thick 20cm crushed stone or cobble to make the sparse water layer, in order to make the water inside the soil drain along the drain hole.
(3) the top surface of retaining walls should have an appropriate slope so that the surface water flows to the outer side of the retaining wall.
4. governance methods
您可能关注的文档
- 各报纸投稿(Contributions from newspapers).doc
- 各种促销方式下的零售销项税基(A variety of promotions under the retail sales tax base).doc
- 各种原则(喜悦心)(Various principles (joy)).doc
- 各种本质、核心、方针、路线、指导思想总结(A summary of various essences, cores, policies, lines and guiding ideology).doc
- 各种水晶和石头的功效(The effect of various crystals and stones).doc
- 各种饮料批发价(Wholesale price of various drinks).doc
- 各类体检套餐(All kinds of medical packages).doc
- 各地古玩(Antiques by nationality).doc
- 各类电梯故障与修复(Various types of elevator failures and repair).doc
- 各地时间,汇率,节日,港口(Time, exchange rate, festival, port).doc
- [中央]2023年中国电子学会招聘应届生笔试历年参考题库附带答案详解.docx
- [吉安]2023年江西吉安市青原区总工会招聘协理员笔试历年参考题库附带答案详解.docx
- [中央]中华预防医学会科普信息部工作人员招聘笔试历年参考题库附带答案详解.docx
- [保定]河北保定市第二医院招聘工作人员49人笔试历年参考题库附带答案详解.docx
- [南通]江苏南通市崇川区人民法院招聘专职人民调解员10人笔试历年参考题库附带答案详解.docx
- [厦门]2023年福建厦门市机关事务管理局非在编工作人员招聘笔试历年参考题库附带答案详解.docx
- [三明]2023年福建三明市尤溪县招聘小学幼儿园新任教师79人笔试历年参考题库附带答案详解.docx
- [哈尔滨]2023年黑龙江哈尔滨市木兰县调配事业单位工作人员笔试历年参考题库附带答案详解.docx
- [上海]2023年上海市气象局所属事业单位招聘笔试历年参考题库附带答案详解.docx
- [台州]2023年浙江台州椒江区招聘中小学教师40人笔试历年参考题库附带答案详解.docx
最近下载
- S7-1200 G2 可编程控制器-系统手册2024.12.pdf VIP
- 2023年35届江苏金钥匙科技竞赛高中初赛试题真题(含答案).pdf VIP
- 一种铁稳定富硒陶瓷材料及其制备方法.pdf VIP
- J_BT 8727-2017 液压软管总成.pdf
- 电磁学全套课件.pptx VIP
- 2021最新冀人版科学四年级下册教学计划及教学进度表.docx
- T_CIECCPA 053—2024 化学吸收法捕集燃煤烟气二氧化碳装备 再生富碳气体纯化设备.pdf VIP
- 重点中学内部职权流程图.docx
- 部编版道德与法治四年级(下)单元分析单元备课课程纲要 .pdf VIP
- 《中学生日常行为规范》知识竞赛试题(答案) .pdf
文档评论(0)