建筑问答(Architecture ask).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑问答(Architecture ask)

建筑问答(Architecture ask) 1 basic requirements for water supply pipeline layout and laying: 1. to ensure good hydraulic condition, and strive to meet the aesthetic and economic rationality; 2. maintenance requirements; 3. to meet the production and use of safety; 4. to ensure that the water is not contaminated or does not affect the use of protection from damage; 5. pipelines; 6. pipeline installed and concealed; 7. pipe laying should also pay attention to problems (such as the A. water horizontal pipe passes through the bearing wall or foundation, vertical pipe through the floor when are reserved holes). 2 meter choice: (to determine the type and caliber water meter water meter) in uniform, should be used to install a water meter diameter flow pipe is not greater than the design flow meter to determine, because traffic is allowed to pass through the water meter used in quite a long period of time in the water flow; uniform, continuous and peak load no more than 2-3 hours every day and night, spiral type water meter can be according to the design flow is not greater than the overload flow meter to determine meter diameter, flow meter is allowed because of overload in a short time through the traffic. In life, the public fire protection system, because the fire flow only when the fire happens, only through the meter, the meter pipe design flow does not include the fire flow, but in selected meter caliber, should check with the fire, the fire of life flow, meet the design flow and does not exceed the value of flow meter overload. 3 basic steps: the hydraulic calculation of the most unfavorable water distribution point 1., calculated from 2. lines; the most unfavorable water distribution point, node number and mark the calculation of pipe length; 3. according to the equivalent number of sanitary ware calculated pipe design flow; hydraulic calculation of 4. water supply network, determine the head the loss of the pipe diameter and the length of the 5. units; determine the

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档