水利工程施工考试复习资料(Review materials for construction of hydraulic engineering construction).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水利工程施工考试复习资料(Review materials for construction of hydraulic engineering construction)
水利工程施工考试复习资料(Review materials for construction of hydraulic engineering construction)
Powder ammonium nitrate explosive: ammonium TNT, ammonium oil explosive, ammonium powder
Water-bearing ammonium nitrate explosive: slurry explosive, water gel explosive, emulsion explosive
Type of detonators: fire detonators, electric detonators, and detonators
Type of detonating material: fuse, detonator and detonating pipe, detonating tube and detonating pipe connection element
Initiation method: non-electric detonation, electric detonation non-electric detonation including fuse, detonating pipe, detonating cord and detonating cartridge
Blasting parameters: unit explosive consumption, perforation diameter and perforation depth, chassis resistance line, hole depth, hole spacing and spacing, loading calculation, initiation network
Blasting construction includes: drilling technique and blasting operation technique
The process of blasting operation: the preparation of the work, the explosive charge of the loading and filling of the network, the blasting, detonation, post-detonation inspection
Blasting public hazards: blasting earthquake, blasting air shock wave and water shock wave, blasting flying stone (minimum safe distance 300m)
Grouting pressure is greater than 3 ~ 4MPa and the grouting is called high-pressure grouting. High pressure grouting is used in high dam.
Grouting construction procedures include: grouting hole location, drilling, drilling (crack) flushing, water pressure test, slurry configuration, filling paste, grouting finish, grouting quality inspection
Grouting pressure is the pressure of the middle slurry of the grouting hole
Drilling irrigation method: full-hole drilling irrigation and full-hole section drill irrigation: top-down method, bottom-up method, comprehensive grouting method, hole sealing method
Grouting finish condition: one is residual slurry volume, and one is the closure time
Drilling grouting method for gravel formation: pipe grouting, casing grouti
您可能关注的文档
- 学前儿童发展心理学(Preschool child development psychology).doc
- 学好英语的方法(The way to learn English well).doc
- 学校教学环境卫生监测与管理(School teaching environment health monitoring and management).doc
- 学生必看之公益广告(Students must see public service advertisements).doc
- 孩子注意力不集中是家长惹的祸(It is the parents who blame the children for their lack of attention).doc
- 宁波中小企业物流信息化管理(Ningbo sme logistics information management).doc
- 宁夏医科大学病生复习题(The problem of medical college of ningxia medical university).doc
- 孔雀的养殖技术(The breeding technology of peacocks).doc
- 宁波舞蹈培训——傩舞,在永靖俗称七月跳会,起源于远古时代的图腾崇拜、宗教祭祀活动(Ningbo dance training - nuo dance, commonly known as the July dance in yongjing, originated from the totem worship and religious sacrificial activities of ancient times).doc
- 宋昱学医(Song yu study medicine).doc
文档评论(0)