新建地龙穿越(New earthworm crossing) Construction plan of large excavation and crossing of highway 1. project overview The pipeline of nineteen sections of the west to east gas pipeline is 1016 * 17.5mm, passing through 1 13 meter highways, 1016 * 21mm, passing through two highways with a total length of 42 meters, and adopting large excavation methods to pass through. 2. construction procedures Construction preparation, surveying, laying, construction, detour, pavement (or making steel bridge) ditch excavation Main section prefabrication and pressure test Backfill restoration, landscape installation, accessories, supervisor crossing 3. main process construction method 3.1 construction preparation 3.1.1 familiar with drawings, grasp the structure, depth and so on 3.1.2 check the construction equipment, means, materials are complete, intact. 3.1.3 contact with the highway authorities, and pass through the construction permit procedures as required. 3.1.4 determine if there are obstructions such as pipes, cables, cables and so on through the underground. 3.1.5 site site leveling. 3.2 measure the line According to the drawings, pass through the center line, the work belt boundary line, through the start stop point position. 3.3 main section prefabrication and pressure test Group 3.3.1, welding The cross tube is placed on a well formed prefabricated yard for welding and welding. Construction methods and quality standards are the same as those for main pipe welding. 3.3.2 pressure test After the welding hole has passed the nondestructive test, the water pressure test shall be carried out as required. Test on the strength test and tightness test, the test pressure test pressure according to the requirements of highway area, pressure test time shall not be less than 4 hours, tightness test time shall not be less than 24 hours. The head, pressure gauge and inlet pipe are installed at both ends of the pipe section, and the pressure test program and safety measures are carried out

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档