轮机工程英语 02(Engineering English 02).docVIP

  • 1
  • 0
  • 约7.58千字
  • 约 9页
  • 2017-08-03 发布于河南
  • 举报

轮机工程英语 02(Engineering English 02).doc

轮机工程英语 02(Engineering English 02) 24. Test of spray device. The test of spraying and flushing equipment Ⅲ. Ship piping system integrity, tightness submission terms for the completeness and tightness of the piping system. Please clear the rubbish. 2. Please keep well ventilated and do the gas explosion test. Please keep good ventilation and do the gas explosion test. Please provide us with the finished plan of this system. Please change this dress into water tight construction. Remove the valve piece and check if it is the cut-off valve Disconnect this valve to see is it is a non - return valve

文档评论(0)

1亿VIP精品文档

相关文档