大棚钢架施工组织设计1(Design of construction organization of steel frame).doc

大棚钢架施工组织设计1(Design of construction organization of steel frame).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大棚钢架施工组织设计1(Design of construction organization of steel frame) Chapter 1 overview of the project This project is a stainless steel hall grid structure project. Adopt column bottom chord point of support, the project is put four pyramid form, the total projection area 36.84 ㎡. 1.2 production and processing characteristics The project should be arranged reasonably in the production process to ensure the normal operation of each process. First, the size of the lower material of the rods must be accurate, and the factors affecting the size of the welding shrinkage are taken into account. The cutting surface of bolt ball is accurate and the Angle error is limited to 6159. Bolt, sealing plate, taper head, sleeve, top wire and other parts shall be inspected according to corresponding standards and specifications to ensure the quality of the net. 1.3 the design, production and construction of the frame shall comply with the following specifications: Structure and construction rules of the grid. Evaluation standard of quality inspection of network frame structure engineering. Steel structure design specification gbj17-88; Steel grid industry standard JGJ75.1 -- 75.75.91; High strength bolts for bolted ball joints of steel mesh frame; GB/T16939; Construction load specification gbj9-87. Chapter ii production and processing 2.1 processing range 2.1.1 the project is a stainless steel mesh frame project, and the material shall be made to meet the design requirements. 2.1.2 material preparation shall be prepared within 5 days after the contract is signed, and the processing shall be processed according to the drawing organization for 5 days; The net rack is processed at the installation site, the period is 5 days, ensuring the completion within the time limit specified in the contract. 2.2 operation procedure The materials are inspected, samples, materials, cutting, spot welding, welding, inspection, finished product correction, numbering, marking, piling and transportation. 2.3

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档