二级建造师(Secondary constructor).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二级建造师(Secondary constructor) Cuhk lighting Construction of upper structural bracket of bridge (3) construction of the upper structure of the bridge 1) the scaffold is divided into columns, girder and beam supports. According to the material can be divided into wooden bracket, steel bracket, steel and wood mixed bracket and the bracket of the universal rod assembly. 2) the installation and installation of stents and templates shall be noted 1. The connection of the member shall be as close as possible to reduce the deformation of the bracket and make the settlement amount to the expected value. 2 to ensure the stability of the stent, the stent should be prevented from contacting the scaffold and the bridge. The seam of the template must be close together. If there is a gap, it should be plugged tightly in case of leakage. 4. The template of the exterior surface of the building should be lubricated with lime milk, soapy water or colorless lube oil. 5 template application support, use to pull bolt pin tight, inside support steel tube inside support, steel inside support, plastic rubber tube inside support. 3) construction procedure: foundation treatment -- support -- formwork -- concrete casting -- prestress tensioning -- grouting anchor 4) perforation construction method: using temporary support for prefabricated section of prefabricated section for construction; The construction of the cast-in-place with movable support is used. Use the whole hole hoisting or section hoisting the hole construction Construction of @ # culvert (4) culvert construction 1) according to the cross-diameter classification standard, the single-hole span of culvert hole is less than 5m or porous span is less than 8m. The culvert can be divided into brick culvert, stone culvert, concrete culvert and reinforced concrete culvert. In the form of culvert section, it can be divided into pipe culvert, board culvert, box culvert and arch culvert; According to the top fill, the soil can be divided int

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档