二级建造师(Secondary constructor)
Cuhk lighting
Construction of upper structural bracket of bridge
(3) construction of the upper structure of the bridge
1) the scaffold is divided into columns, girder and beam supports. According to the material can be divided into wooden bracket, steel bracket, steel and wood mixed bracket and the bracket of the universal rod assembly.
2) the installation and installation of stents and templates shall be noted
1. The connection of the member shall be as close as possible to reduce the deformation of the bracket and make the settlement amount to the expected value.
2 to ensure the stability of the stent, the stent should be prevented from contacting the scaffold and the bridge.
The seam of the template must be close together. If there is a gap, it should be plugged tightly in case of leakage.
4. The template of the exterior surface of the building should be lubricated with lime milk, soapy water or colorless lube oil.
5 template application support, use to pull bolt pin tight, inside support steel tube inside support, steel inside support, plastic rubber tube inside support.
3) construction procedure: foundation treatment -- support -- formwork -- concrete casting -- prestress tensioning -- grouting anchor
4) perforation construction method: using temporary support for prefabricated section of prefabricated section for construction; The construction of the cast-in-place with movable support is used. Use the whole hole hoisting or section hoisting the hole construction
Construction of @ # culvert
(4) culvert construction
1) according to the cross-diameter classification standard, the single-hole span of culvert hole is less than 5m or porous span is less than 8m.
The culvert can be divided into brick culvert, stone culvert, concrete culvert and reinforced concrete culvert. In the form of culvert section, it can be divided into pipe culvert, board culvert, box culvert and arch culvert; According to the top fill, the soil can be divided int
您可能关注的文档
- 十大最严重核事故盘点(The 10 most serious nuclear accident inventory).doc
- 十个美的原则(Ten principles of beauty).doc
- 十二五主攻新材料方向(The 12th five-year plan will focus on new materials).doc
- 十一游记(Eleven travels).doc
- 十种宝石及鉴赏(Ten kinds of precious stones and appreciation).doc
- 双电源自动切换装置的选用策略 abc(Dual power automatic switching device selection strategy ABC).doc
- 双勾函数(ShuangGou function).doc
- 双龙汽车(ssangyong).doc
- 双鹭药业(002038)利润增长明确的生物医药龙头(Double egret pharmaceutical (002038) a bio-pharmaceutical tap with a clear profit growth).doc
- 双色宣传单小媒体闯大市场(Double color flyer small media break into big market).doc
- 辽宁省大连市大连育明高级中学2024-2025学年高一(下)期中考试数学试卷(含答案).pdf
- 青海省西宁市海湖中学2024-2025学年高二(下)期中考试数学试卷(含答案).pdf
- 山东省淄博市实验中学、齐盛高级中学2024-2025学年高二(下)期中数学试卷(含答案).pdf
- 山东省烟台市牟平第一中学2024-2025学年高一(下)5月月考数学试卷(含答案).pdf
- 辽宁省普通高中2024-2025学年高一(下)期中考试数学试卷(含答案).pdf
- 陕西省咸阳市武功县普集高级中学2024-2025学年高二(下)5月月考数学试卷(含答案).pdf
- 陕西省咸阳市武功县普集高级中学2024-2025学年高一(下)5月月考数学试卷(含答案).pdf
- 内蒙古赤峰市林西县第一中学2024-2025学年高二(下)期中数学试卷(选必2,选必3)(含答案).pdf
- 四川省德阳市第五中学2024-2025学年高一(下)期中考试数学试卷(含答案).pdf
- 四川省绵阳市某中学2024-2025学年高二(下)第三学月月考数学试卷(含答案).pdf
最近下载
- 高温试验箱操作说明书.docx VIP
- QJZ6系列说明书要点.doc
- 2025年一年级数学下册 期末试卷 苏教版(含答案).doc VIP
- 《中华人民共和国学前教育法》解读与培训.pptx VIP
- 中小学2023-2024学年江苏省无锡市惠山区金桥实验学校七年级(下)期末地理模拟试卷优质教育教学资.docx VIP
- 2025年高考英语内蒙古卷含解析及答案.docx VIP
- 举杯吧朋友(高考声乐谱考试教学版)原版考级谱伴奏弹唱版有歌词钢琴谱五线谱正谱.pdf VIP
- 中药材GAP综合信息管理系统的初步研究.docx VIP
- 升压站设备安装调试工程施工质量验收及评定范围划分表.docx VIP
- 山东眀嘉勘察测绘有限公司土地整理监理部管理制度.doc VIP
文档评论(0)