- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
竣工技术总结(Completion technology summary)
This paper is contributed by liang shiting liang
Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
The contract for the FJ2 construction project of the hebei section of the hebei section of the highway jin-jin-hebei (wiu) road from the jinjin road to the hebei province
Technical summary
The fourth construction company in hebei tianjin shantou expressway The fourth construction company in hebei tianjin shantou expressway The fourth building Hebei house or two Hebei section of the housing contract ii project intends to November 2007 in November 007
Technical summary
Name one, project engineering, place, content and construction quantities, technical standards of engineering project name, location, content and construction quantities, and 1 of quantities, the project name: tianjin shantou freeway traffic Lv Qiao toll station 2, project location: located in huanghua Lv Qiao town east; 3, the content and the construction quantities: housing construction, water supply and drainage, heating, electrical and perimeter and other supporting engineering, including toll night at the office floor Framework for institutions, on the ground floor, building height of 10.75 m, building area of 1060 m2; Oil engine room, boiler room, bathroom, pump room for brick mix structure, ground floor, building height 5.3 m, construction area 268m2; The toll booth is a steel mesh frame structure with a height of 8.55 m and a building area of 124m2. Sewage treatment room (fan house) brick mix structure, ground floor, building height 3.85 m, building area 25m2; Brick is a message structure. A layer of the earth, building height 3 m, building area of 17 m. outside engineering including ground water, warm, electricity and supporting facilities, intensity of concrete pavement, square brick ground, box-type transformer foundation, wrought iron wall, stone ditches,
您可能关注的文档
- 西安详细介绍(中英文版)(Detailed description of Xi'an (Chinese and English Edition)).doc
- 西安夜市小吃和自助餐大全!(Xi'an night market snacks and buffet!).doc
- 西安交通大学14年6月课程考试《公共政策与分析》考查课试题(Xi'an Jiao Tong University 14 year June course examination, public policy and analysis examination questions).doc
- 西班牙求援不确定性推升避险资产魅力(Spain's bailout uncertainty raises the charm of safe havens).doc
- 西班牙语发音提要(Spanish pronunciation Abstract).doc
- 西单女孩-任月丽(Xidan girl - Ren Yueli).doc
- 西安18座城门的名称来历(The name of the 18 gates of Xi'an).doc
- 西电《税法与纳税筹划》13春在线作业(West China tax law and tax planning 13 spring online homework).doc
- 西电《成本会计》13春在线作业(West electricity cost accounting 13 spring online homework).doc
- 西都(日语)(Du Du (Japanese)).doc
文档评论(0)