网站大量收购独家精品文档,联系QQ:2885784924

高层建筑混凝土墙板裂缝事故调查分析及处理办法(Investigation and analysis of cracks in concrete wall panels of high-rise buildings).doc

高层建筑混凝土墙板裂缝事故调查分析及处理办法(Investigation and analysis of cracks in concrete wall panels of high-rise buildings).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高层建筑混凝土墙板裂缝事故调查分析及处理办法(Investigation and analysis of cracks in concrete wall panels of high-rise buildings) The high-rise building concrete wallboard cracks accident investigation and analysis and treatment method of _ Chinese construction network address bar enter the building materials or construction design to enter the home page to download data | | User registration fees | | online message | online to engage in investment Housing construction project of Municipal Engineering Highway Bridge railway tunnel engineering of thermal power engineering landscape decoration electrical installation construction supervision file construction process building the free facilities. The qualification, real estate security file and construction contract documents, supervision form, enterprise form The foundation and process of ceiling installation technology and road bridge The structure design, water supply and drainage and water resources in the construction of electrical and HVAC, landscape architecture and the computer architecture, architectural art and economic theory Current position: home building paper structure design design innovation text charges I want to contribute a new user registration user login The high-rise building concrete wallboard cracks accident investigation and treatment measures Author: Li Shujun 1. crack accident 1.1 project overview A high-rise office building in Northwest China, the main building is a reinforced concrete frame tube structure, underground 1 floors, 18 floors on the ground, the total height of 76.8m, total construction area of 36482m2. The building foundation piles, the basement wall thickness of 300mm C30 waterproof concrete. The elevation of 13.6m above the grade of concrete slab thickness were C40, 120mm. 1.2 crack The project started in June 1998, mid September 1998 the construction of basement wall construction, January 19, 1999 to 6 layer beam plate structure. The floor slab in the construction at the same time that the small

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档