电伴热施工(Electric tracing construction)
The document from the network, is my collection of finishing, if there are omissions, errors, please!
Electric heating construction
(a) design
Before the construction should be a complete design
Should include the following information map:
1, line number, represented by the plaid supply point
2, the required power line of tropical type and length
(unit: m)
3 per meter, pipe length required cable length (unit: m) is winding coefficient
4, each valve required electricity zone length
(unit: m)
5, with supporting materials, thermal system accessories list
6 temperature control system of parts list
List of materials required for construction, 7
8, consider the design parameters and the thermal insulation material specifications
(two) preparation work before construction
(A) pipeline system
1, the pipeline system has been completed and are equipped with
2, anticorrosive coating has been dry
In 3, consistent piping system construction specification and design drawing
4, to file all burrs and sharp angle
(B) cables and accessories
1, whether the tropical surface is damaged
2, electric tropical good insulation properties (requirements of insulation resistance in 1000VDC test with the shaking table of no less than 20M Ohm)
Consistent with the design requirements, type 3 cable with all accessories
(C) site preparation
1, a roll of drum and placed in a cable bracket, and placed in the near end of line
2, the cloth along the pipe heater, and avoid:
* will be placed in electric tropical burrs and sharp angle.
* pull cable
* foot or heavy objects on the cable
(three) a single cable construction method
1, glass fiber adhesive tape or aluminum tape at intervals of about 50Cm will be fixed on the pipe heater
2, apply as much as possible will be attached to the tropical electric pipelines under 45 degree lateral
In 3, the first power supply line and the end point of the reserved 1m long cable
4, according to the design shown in [] (coefficient coe
您可能关注的文档
- 肺转移瘤弥漫性肺水肿(Diffuse pulmonary edema, pulmonary metastasis).doc
- 粉煤灰加气砖设备(Fly ash aerated brick equipment).doc
- 翻译单句练习(Sentence translation exercises).doc
- 给《男生女生》投稿的十个为什么(What are the ten contributors to the boys and girls).doc
- 给除草剂添把安全锁(To add a safety lock herbicide).doc
- 给大学生的18个忠告(18 tips for College Students).doc
- 给即将当爸当妈的人看(For someone who's going to be a dad).doc
- 给女朋友的惊喜,让爱情保鲜(Surprise your girlfriend and keep your love fresh).doc
- 给排水管道安装计算及定额应用(Calculation and quota application of water supply and drainage pipelines).doc
- 给排水基础工程师(Water supply and Drainage Engineer).doc
- 2025自考专业(公共关系)考试黑钻押题及答案详解【典优】.docx
- 2025自考专业(公共关系)考试彩蛋押题附参考答案详解【考试直接用】.docx
- 2025自考专业(公共关系)能力提升B卷题库及一套完整答案详解.docx
- 2025自考专业(公共关系)考试彩蛋押题附参考答案详解【名师推荐】.docx
- 2025自考专业(公共关系)考试彩蛋押题附参考答案详解【考试直接用】.docx
- 2025自考专业(公共关系)考试彩蛋押题带答案详解(名师推荐).docx
- 2025自考专业(公共关系)考试综合练习附参考答案详解(典型题).docx
- 2025自考专业(公共关系)考试彩蛋押题(考点梳理)附答案详解.docx
- 2025自考专业(公共关系)考试彩蛋押题及完整答案详解【考点梳理】.docx
- 2025自考专业(公共关系)考试综合练习含完整答案详解【历年真题】.docx
最近下载
- 露天矿采矿与剥离作业规程.pdf VIP
- 电大国家开放大学《政府经济学》(本)2025-2026期末试题及答案2025.pdf VIP
- 第27课 定速巡航的控制 教案 义务教育人教版信息科技六年级全一册.docx VIP
- 幼儿园美术教案《沙漠里的树》植树节主题活动PPT课件.doc VIP
- Java基础知识大全单选题100道及答案.docx VIP
- 工匠精神精品课件.pptx
- 25《带上她的眼睛》课件(共45张PPT).pptx
- 上海海事大学2021-2022年《货币银行学》期末考试试卷(A卷)含参考答案.docx
- 2024年福建省中考化学真题试卷(含答案).docx VIP
- 风电场并网测试方案.docx
文档评论(0)