- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
生活垃圾处理工程(Municipal solid waste treatment project)
201112 water supply and drainage engineering
Environmental Engineering Specialty
Major in mechanical equipment engineering, building environment and equipment engineering, basic data for design
Two, the design of the main documents and the use of standards
Three, city life garbage disposal engineering design, the main contents of the four garbage amount calculation and waste composition analysis of five, city life garbage removal and treatment scheme
Six, garbage collection, temporary storage and transportation system design seven, design of garbage transfer station eight, 1 city garbage treatment project design, planning overall plan and Planning Manual of exergy in
1 in the population of exergy exergy population, population planning in
Land in city 2 exergy
3 exergy in the social and economic development of the local industry and agriculture development
Situation。
2, city or county annals
In 1, the development of the history of the exergy City
In 2 exergy environmental conditions, natural disasters
3, the status of waste and garbage properties 4, meteorological data
In 1 the average annual temperature exergy
2 in the extreme maximum temperature exergy
3 exergy in extreme minimum temperature
Exergy in 4 frost free days
In 5 the annual rainfall exergy including the rainfall maximum rainfall in the
20 years maximum rainfall and monthly distribution of
In 6 the average annual evaporation exergy
7 exergy in the annual average sunshine hours
In 8 years of relative humidity exergy
9 in the dominant wind direction and wind exergy. 5, garbage disposal topographic map
In 1 exergy research, preliminary design 1:1000
2 in the construction design of 1:500 exergy.
6. Data of engineering geological investigation of refuse dump
1 in the feasibility study stage of exergy data
In 2 exergy preliminary design and construction drawing design phase detailed exploration data.
The main principal documents in 7, local building materials su
您可能关注的文档
- 爱华nsx-380组合音响控制电路原理及故障检(Edward nsx-380 audio control circuit principle and fault detection).doc
- 爱康国宾ceo用互联网思维做体检(Ambassador CEO using Internet thinking to do physical examination).doc
- 爱车漆的保养及修补(Maintenance and repair of car paint).doc
- 爱普生打印机报错信息对照表(EPSON printer error message comparison form).doc
- 爱之韵迎新晚会策划书(Love rhyme New Year party planning).doc
- 熬膏(simmer to paste).doc
- 爱情的滋味(The taste of love).doc
- 澳大利亚各课程的英语能力要求(English proficiency requirements for various courses in Australia).doc
- 澳大利亚留学之住宿及通讯(Accommodation and communication in Australia).doc
- 澳大利亚名校推荐及申请条件简介(Australian elite recommendation and application conditions brief introduction).doc
最近下载
- 渤海稠油油田聚合物驱高效开采技术.doc
- 重症患者的早期康复课件.pptx
- 中国南方电网公司招聘笔试题库2025.pdf
- 电气工程基础课程设计报告-110kV变电站电气系统初步设计.doc
- 化工常用阀门介绍.doc VIP
- 新仁爱科普2024版英语七年级上册Unit 1 Let's be friends大单元整体教学设计.docx
- 高考数学五年(2020-2024)真题《空间向量与立体几何(解答题)》分类汇编.docx
- 香港街头最不缺的就是美女,来自世界各地.pdf VIP
- 高考数学五年(2020-2024)真题《空间向量与立体几何》分类汇编.docx
- 2024年考务人员培训系统考试参考答案.docx VIP
文档评论(0)