测量放线及沉降观测(Measurement of caving and settlement observation).doc

测量放线及沉降观测(Measurement of caving and settlement observation).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测量放线及沉降观测(Measurement of caving and settlement observation) A, building construction surveying control network 1, after entering, first by the construction units, supervision units, construction units together to pile units to provide signs the retest, and for a written transfer formalities; then given the stakes as a benchmark for measured area coordinate control network, and submit to supervision and planning departments to review and correct, to establish control points according to the specification, the person responsible for the protection and regular check. Before the excavation, the original positioning axis were measured again and closed, through the positioning axis retest for baseline, the use of orthogonal intersection method, with the main axis of the theodolite engineering control pile, and the use of the main pile measuring units of engineering pile, the permanent control points in buildings last week, closing the measurement error is less than 3mm. According to the construction unit plane size, except in the four angle setting control axis, horizontal axis is provided on the control axis. Axis of control surveying to the scene, should protect the control axis sign is not destroyed. To be on the safe side, each control axis piles in the field far and near respectively measured points, near convenient measurement, far point for protection and calibration, regular inspection of the axis between the size of. 2, using a theodolite construction control network size, the measurement should be not less than a survey. 3, the establishment of construction plane control network using metric ruler, should be as far as possible to keep the ends of steel ruler can be the same level. 4, the unified construction control network, level, built (structure) the main axis of building the control point, should set a solid, stable, sink, fixed position, and concrete protection, key signs can be added fence enclosure. Mark the axis extension axis pile, Longmen frame should

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档