- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测量放线及沉降观测(Measurement of caving and settlement observation)
A, building construction surveying control network
1, after entering, first by the construction units, supervision units, construction units together to pile units to provide signs the retest, and for a written transfer formalities; then given the stakes as a benchmark for measured area coordinate control network, and submit to supervision and planning departments to review and correct, to establish control points according to the specification, the person responsible for the protection and regular check. Before the excavation, the original positioning axis were measured again and closed, through the positioning axis retest for baseline, the use of orthogonal intersection method, with the main axis of the theodolite engineering control pile, and the use of the main pile measuring units of engineering pile, the permanent control points in buildings last week, closing the measurement error is less than 3mm. According to the construction unit plane size, except in the four angle setting control axis, horizontal axis is provided on the control axis. Axis of control surveying to the scene, should protect the control axis sign is not destroyed. To be on the safe side, each control axis piles in the field far and near respectively measured points, near convenient measurement, far point for protection and calibration, regular inspection of the axis between the size of.
2, using a theodolite construction control network size, the measurement should be not less than a survey.
3, the establishment of construction plane control network using metric ruler, should be as far as possible to keep the ends of steel ruler can be the same level.
4, the unified construction control network, level, built (structure) the main axis of building the control point, should set a solid, stable, sink, fixed position, and concrete protection, key signs can be added fence enclosure. Mark the axis extension axis pile, Longmen frame should
您可能关注的文档
- 电力专业知识(Power professional knowledge).doc
- 电炉炼钢烟尘的综合利用[1](Comprehensive utilization of smoke and dust in EAF steelmaking [1]).doc
- 电路改造和吊顶(Circuit modification and ceiling).doc
- 电路改造和吊顶经典(Circuit reconstruction and ceiling classic).doc
- 电路基础08(Circuit Fundamentals 08).doc
- 电路识图(Circuit diagram).doc
- 电磨使用技巧(Grinders use skill).doc
- 电路图的知识(Knowledge of circuit diagrams).doc
- 电脑防辐射(Computer radiation protection).doc
- 电脑皮及知识(Computer leather and knowledge).doc
最近下载
- U校园-新一代大学英语(提高篇)综合教程1和2(全).pdf VIP
- 零星维修工程服务方案.pptx
- 地理试讲逐字稿 (一).pdf VIP
- 2011年滁州市中学高级教师专业技术职务任职资格评审通过人....DOC VIP
- 中国铁路总公司关于取消铁路建设项目开工报告审批的通知,铁总计统[2015]252号.pdf VIP
- 标准图集-提灌站建设项目施工图.pdf VIP
- 18K802图集—暖通空调系统的检测与监控(水系统分册).pdf VIP
- 大学发展心理学考试(习题卷1).pdf VIP
- 泌尿、男性生殖系统.ppt VIP
- 建筑工程图集 12R11612K512:污水源热泵系统设计与安装.pdf VIP
文档评论(0)