房地产施工用电管理数据(Management data of real estate construction electricity consumption)
The power management data in real estate construction
A preliminary preparation
The project at the same time, power supply will be pre planning problem. As a professional electrical construction unit, should make the following work: * according to the construction project construction area, estimation of power load according to 50W/m2 construction area index estimation. See the Beijing city municipal civil building energy planning index recently.
According to the required power supply load of power supply scheme, estimate the construction area of 400 thousand m2 required by the regional power supply bureau for Substation Switching Station 2 3 x 300mm2 high voltage power cable to the construction zone, and then by the switching station respectively to the area of the power distribution room. (2 x 3 150mm2 cable)
The construction area of 40 thousand m2) to set up a small power distribution room, on the level of its 10KV high voltage power supply by the development zone of the switching station and development area of 400 thousand m2 or by the power supply bureau area substation direct supply. (zone total area is small)
Have finally entrusted with the power supply bureau design, consulting units for the feasibility report of power supply scheme. (this is the project and after installation of the necessary documents and information)
In the phase of the project, to contact with the electricity sector, the business department of planning department, the power supply reliability of the project, electricity capacity, power supply and power supply conditions have reached an agreement of intent, we can establish a project addressing.
A switching station, power distribution room and power cable construction cost data in Table 1
High voltage cable engineering: flame retardant cable ZRYJV2215KV 3 * 300mm2
Cable price: 280 thousand ~ 360 thousand /1KM
Project cost: 800 thousand units: /KM
No demoliti
您可能关注的文档
- 电路基础08(Circuit Fundamentals 08).doc
- 电路识图(Circuit diagram).doc
- 电磨使用技巧(Grinders use skill).doc
- 电路图的知识(Knowledge of circuit diagrams).doc
- 电脑防辐射(Computer radiation protection).doc
- 电脑皮及知识(Computer leather and knowledge).doc
- 电脑入门基础(Fundamentals of Computer Science).doc
- 电脑系统代码(Computer system code).doc
- 电脑硬件组装全过程——主板安装图解(The whole process of computer hardware assembly - motherboard installation diagram).doc
- 电脑知识 (198)(Computer knowledge (198)).doc
- GB/T 14598.2-2025量度继电器和保护装置 第1部分:通用要求.pdf
- 中国国家标准 GB/T 14598.2-2025量度继电器和保护装置 第1部分:通用要求.pdf
- 《GB/T 14598.2-2025量度继电器和保护装置 第1部分:通用要求》.pdf
- 《GB/T 14598.26-2025量度继电器和保护装置 第26部分:电磁兼容要求》.pdf
- GB/T 14598.26-2025量度继电器和保护装置 第26部分:电磁兼容要求.pdf
- 中国国家标准 GB/T 14598.26-2025量度继电器和保护装置 第26部分:电磁兼容要求.pdf
- 《GB/T 19024-2025质量管理体系 面向质量结果的组织管理 实现财务和经济效益的指南》.pdf
- 中国国家标准 GB/T 19024-2025质量管理体系 面向质量结果的组织管理 实现财务和经济效益的指南.pdf
- GB/T 19024-2025质量管理体系 面向质量结果的组织管理 实现财务和经济效益的指南.pdf
- 中国国家标准 GB/T 20441.8-2025电声学 测量传声器 第8部分:测定工作标准传声器自由场灵敏度的比较法.pdf
文档评论(0)