- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
对建筑工程施工质量控制的探讨(Discussion on quality control of building construction)
Discussion on building construction quality control
The construction market competition intensified, the construction enterprises in order to survive and develop in the market competition, in the whole process of the implementation of the project, the construction enterprises in order to achieve the project objectives, to ensure the engineering quality, shorten construction period and reduce the project cost, must carry out the target management of the whole process of Engineering project.
1 strengthen control
Refers to people directly involved in the construction of the organizers, commanders and operators. In the pre construction technical qualification examination by the contractor, to see whether it has completed the project and to ensure the quality of engineering technical ability and management level. In recent years, due to the reform of construction enterprises, Guotuiminjin, coupled with the rapid expansion of the scale of construction, a large number of migrant workers into the ranks of the team building, the poor quality of these people, have great influence on the construction of the whole quality of hugh. Some contractors and technical personnel, technical force is weak. The construction site management to the human centered, to the quality of work and ensure the process quality, improve construction management level. At the same time, to improve the engineering quality supervision institutions, improve the level of quality supervision personnel. The construction site to establish quality assurance system, should have clear responsibilities, with a caliber talk, all unified treatment of the construction site, management personnel should gradually adapt to the needs of the construction management, project management to learn new knowledge and new technology, improve the quality of water in the flat, do the standardization management of construction. In order to fundamentally improve
您可能关注的文档
- 建筑电气工程论文建筑电气论文浅谈建筑电气工程管理(Building electrical engineering thesis Building Electrical Engineering Building Electrical Engineering Management).doc
- 机械设计(machine design).doc
- 机械设计手册程序版(Mechanical design manual program version).doc
- 机械设计专业术语的英语翻译1(Mechanical design terminology English translation 1).doc
- 建筑电气绘图知识(Knowledge of building electrical drawing).doc
- 机械识图与公差配合—劳动预备制(Mechanical drawing and tolerance matching - labor preparation system).doc
- 建筑电气识图基础(Building electrical knowledge base).doc
- 机械图纸英语翻译(Mechanical drawings, English translation).doc
- 机械英文1(Mechanical English 1).doc
- 建筑电气照明设计(Building electrical lighting design).doc
文档评论(0)